Laserfiche WebLink
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01 <br />Cummins Cederberg | Trusted by the Coast. Proven in Practice. <br />45 <br />JANNEK CEDERBERG, PE <br />Principal in Charge <br />Currie Park Redevelopment, West Palm Beach, Florida. Principal engineer for all the waterfront design for the Currie <br />Park Redevelopment project. Project includes marine surveying, engineering design, environmental permitting, <br />and grant implementation support for the waterfront work including rock revetment, living shoreline, boat ramp <br />improvements, kayak launches, new over water piers and boardwalks, and “social” steps down to the water. <br />Dade Boulevard Seawall Replacement, Miami Beach, Florida. Marine engineering and construction drawings for <br />2,670 LF of seawall replacement with steel sheet pile and reinforced concrete cap. Structural design of barrier wall <br />connection to cap, and utility crossover detail for FPL 69KV oil-filled transmission line. Pre-construction seawall <br />inspection of opposite shoreline, and vibration monitoring during pile driving activity. <br />Costa Brava Marina, Miami Beach, Florida. Environmental permitting for reconstruction of a 30-slip marina in <br />Biscayne Bay through local, State, and Federal Agencies including DERM, FDEP, and USACE. Engineering support <br />through construction bid process, including bid evaluation, contractor selection and construction administration. <br />Sunset Harbour Yacht Club, Miami Beach, Florida. The project included repairs of concrete slabs, caps and piles <br />for 125-slip marina located in Biscayne Bay Aquatic Preserve, which has strict environmental guidelines. A marine <br />resource assessment was conducted to assess potential impacts. Pre-application meetings were conducted with <br />environmental agencies to understand primary concerns and potential impacts on schedule. Environmental permit <br />applications were prepared and processed with DERM, FDEP, and USACE. Building permit was obtained with City of <br />Miami Beach. Detailed repair drawings were prepared with specific criteria to minimize impacts to marine resources <br />and water quality. <br />Coco Plum Beach Erosion Study and Beach Design, Marathon, Florida. Prepared an erosion study for the City of <br />Marathon in Monroe County. Design and permitting of truck haul project for placement of sand above the mean high- <br />water line. Coordinate with environmental agencies for approval of design and sand source. <br />Fisher Island Ferry Terminals, Miami-Dade County, Florida. Principal engineer for the permitting and engineering <br />design for the replacement of two existing commuter ferry terminals on Fisher Island. The replacement includes the <br />design and permitting of new steel sheet pile bulkheads, transfer ramp support structures, and berthing fenders. <br />Value engineered all elements and worked with contractor to lower costs in extremely volatile construction materials <br />market. Geo5, SPW911, and CWALSHT softwares were used for the bulkhead design. Allpile software was used for the <br />design of fenders and ramp support structures. Deliverables to client included permit and construction drawing sets. <br />Biscayne Point Dredging, Miami Beach, FL (Ongoing). Senior coastal engineer overseeing dredge design template for <br />improved navigation within an existing residential canal. Coordinated with federal, stated, and local regulatory agencies <br />to develop mitigation requirements, identify potential dredge material management options, provided technical review, <br />and oversight of geotechnical investigation. <br />Crandon Park Marina Sedimentation Study, Key Biscayne, Florida. Senior project manager leading tidal hydrodynamic <br />modeling, wave, and sediment transport analyses to determine source and magnitude of marina sedimentation <br />problem. Field investigations included bathymetric surveying, tide and current measurements, marine resource <br />survey, and sediment sampling. Alternative assessments of potential coastal structures were explored to prevent <br />sedimentation and need for periodic dredging. <br />Vizcaya Museum & Gardens Storm Surge Protection Wall, Miami, Florida. Site plan, engineering design, and <br />environmental wetland restoration at historic waterfront garden. Grant application, regulatory permitting, and <br />engineering design for marine works. Wall design with reinforced concrete able to withstand storm surge and high <br />wave loads associated with tropical storm event.