|
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01
<br />Cummins Cederberg | Trusted by the Coast. Proven in Practice.
<br />53
<br />MATTHEW TRAMMELL, PE
<br />Senior Coastal Engineer
<br />their beach restoration projects. Work responsibilities include preparation of contract documents, construction plans,
<br />and technical specifications; overseeing daily construction observations services, conducting pre-bid and project
<br />progress meetings and substantial completion and final inspections; sediment and protected species monitoring
<br />programs; reviewing contractor submittals, pay applications, and project surveys; project certification; collection and
<br />analysis of monitoring surveys; and preparation and submittal of post-construction reports.*
<br />Highway 98 Living Shoreline Project, Okaloosa County, Florida. Leading a large-scale living shoreline project stabilizing
<br />approximately 4,500 linear feet of Highway 98, overseeing environmental consulting, coastal engineering, and design
<br />advancement to permit- level maturity.
<br />Dune Walkover Replacements, Sanibel Island, Florida. Provided project management, coastal engineering
<br />coordination, and regulatory permitting support for the design and replacement of fourteen (14) public dune walkovers
<br />and boardwalks damaged by Hurricane Ian for the City of Sanibel. Supported multi site coordination including field
<br />investigations, surveying, geotechnical exploration, coastal resilience evaluations, and development of marine
<br />engineering designs for timber pile supported, ADA compliant, storm resilient structures. Assisted with FDEP CCCL
<br />permitting across multiple beach access locations, including pre application coordination, and provided expedited
<br />agency responses to advance regulatory review and support construction within a limited construction window.
<br />Additional services included bid support and interagency coordination to advance the large scale coastal infrastructure
<br />recovery program.
<br />City of Sarasota Resiliency Initiative and Grant Administration, Sarasota, Florida. Facilitated project management,
<br />grant administration, and resiliency planning support for the City of Sarasota’s Citywide Resiliency Initiative, a
<br />multi part program focused on reducing coastal flood risk and advancing implementation of the City’s Vulnerability
<br />Assessment and Adaptation Plan. Supported administration and compliance for a $2.6 million Florida Department
<br />of Environmental Protection (FDEP) Resilient Florida Grant and a $500,000 West Coast Inland Navigation District
<br />(WCIND) grant supporting Bayfront Park Seawall Rehabilitation, Ken Thompson Park Living Shoreline and Armoring,
<br />and Citywide Topographic Mapping projects. Assisted with development of grant work plans, schedules, and contract
<br />agreements, including revisions and amendments as projects progressed. Managed coordination with City staff, FDEP
<br />grant managers, WCIND representatives, and consultant teams; supported preparation of quarterly grant reports,
<br />payment requests, match documentation, and budget tracking; and facilitated alignment of resiliency policies,
<br />stakeholder engagement, and technical deliverables across multiple concurrent projects.
<br />Manasota Key Roadway Reconstruction, Sarasota County, Florida. Provided coastal engineering support for the PD&E
<br />phase of a roadway reconstruction project addressing approximately 2,400 linear feet of hurricane damaged Gulf
<br />front roadway. Led coordination of coastal engineering due diligence, regulatory screening, and site specific coastal
<br />modeling to evaluate storm surge, wave transformation, runup, overtopping, and erosion hazards under existing and
<br />future sea level conditions. Managed development of shoreline stabilization alternatives—including dune restoration,
<br />buried revetments, sheet pile and hybrid systems—and advanced a preferred conceptual design with preliminary
<br />sections, quantities, and technical memoranda to support the Preliminary Engineering Report and long term roadway
<br />resiliency planning.
<br />Monroe County US-1 Shoreline Stabilization Planning, Engineering and Design, Monroe County, Florida. Senior
<br />Engineer / Technical Lead. Led extensive site visits and investigations with the full design team and performed a
<br />detailed value engineering study for the protection of US-1, the only hurricane evacuation route within Monroe County
<br />serving the Florida Keys. The value-engineering study outlined the federal authorization requirements and assessed
<br />numerous design alternatives through preliminary designs, cost estimates, functionality rankings, lifecycle performance
<br />and other parameters to provide a justifiable recommendation for final engineering design and construction.*
<br />*Services provided from previous firms
|