Laserfiche WebLink
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01 <br />Cummins Cederberg | Trusted by the Coast. Proven in Practice. <br />61 <br />RASHEED K. MUSLIMANI, PE, PMP <br />Construction Administration Lead <br />included construction administration to verify work was completed in accordance with construction documents and <br />environmental permits, review of contractor submittals, and on-site coordination during repair activities. The project <br />was completed on schedule and within budget, restoring safe and reliable marina operations. <br />St. Pete Marina Design-Build Redevelopment, St. Petersburg, Florida. Providing engineering design for a large- <br />scale design-build marina redevelopment project intended to modernize and expand an existing waterfront marina <br />facility. The project includes redevelopment of more than 600 marina slips, seawall replacement, bridge replacement, <br />and upland building improvements to enhance operational capacity, safety, and resilience. Services to be performed <br />include leading the multidisciplinary design team and specialty consultants, coordinating technical disciplines, and <br />advancing design development to support design-build delivery. <br />Las Olas Marina Redevelopment, Fort Lauderdale, Florida. Provided construction support services for the <br />redevelopment and modernization of the Las Olas Marina to accommodate seasonal and transient vessels, deep- <br />water megayachts, and enhanced marina amenities. The project includes installation of approximately 1,400 LF <br />of new seawall, five floating piers, and landside improvements such as a boater services building and restaurant. <br />Responsibilities included marine construction support, coordination with contractors and project stakeholders, <br />and technical oversight during seawall and pier installation. Construction is underway as part of a phased marina <br />redevelopment program to improve functionality and user experience. <br />Venetian Marina & Yacht Club, Miami Beach, Florida. Providing marine engineering and environmental consulting <br />services for the redevelopment and expansion of the Venetian Marina & Yacht Club, involving demolition of the existing <br />facility and reconstruction of an expanded marina extending toward the Intracoastal Waterway. The project includes <br />redevelopment of a 215-slip fixed-dock marina accommodating vessels up to approximately 120 feet, wave attenuation <br />features, and full utility systems including electrical, potable water, fire protection, sanitary pump-out, lighting, and fuel <br />infrastructure. Services performed include leading the multidisciplinary design team and consultants, marina layout <br />and slip planning, mooring and berthing analyses, wave and current modeling, marine structural design, utility design, <br />and coordination of environmental permitting with FDEP, USACE, and Miami-Dade County DERM. <br />Westlake Park Segment 4, Hollywood, Florida. Provided marine engineering design and construction administration <br />services as part of Broward County Parks and Recreation’s initiative to enhance shoreline features and restore <br />mangrove habitat within Westlake Park. The project included the design and installation of approximately 10,000 <br />LF of shoreline crib-breakwater system to improve shoreline stabilization and promote habitat restoration. Services <br />performed included leading the multidisciplinary design team, conducting site inspections, and overseeing the <br />marine construction team during construction management activities. Construction is complete, resulting in improved <br />shoreline resilience and enhanced environmental conditions within the park. <br />Jungle Island Shoreline Stabilization, Miami Beach, Florida. Provided construction support for shoreline stabilization <br />improvements at Jungle Island, a zoological park located along the Biscayne Bay Aquatic Preserve on Watson Island. <br />The project included stabilization of approximately 1,000 LF of unconsolidated shoreline through installation of <br />a rock revetment system designed to minimize impacts to mangroves and marine resources. Services performed <br />included construction coordination, site meetings and inspections, and technical support during installation, as <br />well as involvement in design development and planning for future phases of shoreline and docking improvements. <br />The shoreline stabilization phase was completed under permits issued by the U.S. Army Corps of Engineers, Florida <br />Department of Environmental Protection, and Miami-Dade County Division of Environmental Resources Management, <br />resulting in improved shoreline resilience and long-term environmental protection. <br />Matheson Hammock Park Boat Ramp, Miami, Florida. Provided construction-phase engineering support for <br />improvements to the boat ramp facilities and the associated north adjacent parking lot at Matheson Hammock Park as <br />part of a multi-phase shoreline and access enhancement program. The project included replacement of existing boat <br />ramps and docks. Services performed included construction coordination, participation in on-site progress meetings, <br />review of contractor submittals and RFIs, and field support to address constructability and sequencing within an active <br />public park.