Laserfiche WebLink
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01 <br />Cummins Cederberg | Trusted by the Coast. Proven in Practice. <br />67 <br />WILLIAM LORENTZEN, PG <br />Environmental Permitting <br />approximately 6,700 LF of existing channel along the western portion of Phillippi Creek for the West Coast Inland <br />Navigation District (WCIND). Responsibilities include assisting with quality assurance/quality control, reviewing <br />geotechnical reports, analyzing borehole data, and overseeing data collection. <br />Crandon Park Marina Dredging, Miami Beach, Florida. Providing coastal marine engineering to assess and develop <br />solutions for the areas affected by sand and sediment buildup, ensuring a minimum depth of 6 feet at low tide. Assisting <br />with all aspects of dredging design needs and long-term maintenance strategies, addressing sediment accumulation <br />issues and enhancing marina functionality and user experience. <br />Titusville Marina Dock Replacement, Titusville, Florida. Led a marine resource survey and assisted with marine <br />engineering inspection of the existing conditions at the municipal marina. <br />Le Armonia Shoreline Shoreline Stabilization and Dock, Palm Beach Gardens, Florida. Led the marine resource <br />survey and environmental permitting for a 300 LF rock revetment and dock at a residential estate. <br />Biscayne Point Maintenance Dredging, Miami Beach, Florida. Conducted a marine resource survey, prepared <br />geotechnical analyses, and obtained environmental permits. Assisted with dredge template design and the permitting <br />process for the maintenance dredging of approximately 7,650 LF of residential canal systems for the City of Miami <br />Beach. <br />Stuart Courtesy Dock, Stuart, Florida. Cummins Cederberg designed the replacement of the existing day-use municipal <br />floating dock with a new fixed dock in downtown Stuart. Participated in a marine resource survey and prepared an <br />Environmental Survey report with the results. <br />Jaycee Park, Cape Coral, Florida. Assisted with the marine resource survey along the Caloosahatchee River to assess <br />existing conditions. <br />Village of Bal Harbour, Bal Harbour, Florida. Assisted with a preparation of a peril of flood comprehensive plan for use <br />in grant applications. <br />Le Armonia Shoreline Stabilization and Dock, Palm Beach Gardens, Florida. Led the marine resource survey and <br />environmental permitting for a 300 LF rock revetment and dock at a residential estate. <br />Dolphin Pointe, West Palm Beach, Florida. Cummins Cederberg was contracted to perform a marine resources survey <br />of an aging seawall at the Dolphin Pointe condominium as well as prepare environmental permits through FEDP and <br />USACE for its replacement. Will carried out a marine resources survey along the seawall using Trimble Geo7X GPS <br />unit, GIS, and SCUBA equipment. This survey resulted in a field observation report, marine resources map, and GIS <br />basemap. Due to the high volume of coral found at this location we created coral relocation plan in order to satisfy <br />permit requirements for replacement. <br />Fisherman’s Wharf, Fort Pierce, Florida. Provided a marine resources survey as part of the ongoing marina <br />redevelopment project at Fisherman’s wharf Ft. Pierce. This marine resource survey resulted in a field observation <br />report, and marine resource survey basemap in GIS. <br />Currie Park Benthic Survey, West Palm Beach Florida. Currie Park is a 13.6-acre public waterfront park. The city is <br />preparing an adaptive redesign of the park to mitigate flooding from rainfall, king tides, and sea level rise. Performed <br />a benthic survey of the intracoastal waterway. Developed several different marina management options for the city <br />based on research of municipally owned marinas throughout the state. Also, assisted in identifying potential grant <br />opportunities, which resulted in $16M of DEO grant funding towards the project and assisted with living shoreline <br />design and environmental permitting of the park redevelopment.