My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Bid Document (14)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Cummins Cederberg
>
Cummins Cederberg Bid Document (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:04:38 PM
Creation date
8/31/2026 1:03:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01 <br />Cummins Cederberg | Trusted by the Coast. Proven in Practice. <br />83 <br />• Real-time budget tracking using Deltek Vantagepoint <br />to monitor labor, budget burn, and cost-to-complete. <br />• Alignment of design and permitting requirements <br />to minimize redesign and avoid permit-driven cost <br />escalation. <br />• Clear scope definition and early risk identification to <br />reduce unforeseen conditions and change orders. <br />• Application of local and regional experience to avoid <br />constructability issues in constrained waterfront <br />environments. <br />These techniques reduce change orders, support <br />competitive bidding, and maintain alignment with City <br />budget expectations. <br />REPRESENTATIVE COST CONTROL EXPERIENCE <br />Cummins Cederberg consistently delivers living shoreline, <br />coastal infrastructure, and waterfront improvement <br />projects within established budgets through proactive <br />cost estimating, value engineering, and ongoing budget <br />management. <br />Representative examples include: <br />Currie Park Redevelopment, West Palm Beach <br />• Assisted the City in securing more than $20 million <br />in grant funding from five separate grant programs, <br />including a $16 million Florida Commerce Community <br />Development Block Grant-Mitigation award, <br />significantly reducing implementation costs. <br />• Evaluated living shoreline alternatives and modified <br />breakwater configurations to satisfy environmental <br />objectives while avoiding redesign costs and <br />permitting delays. <br />• Implemented phased permitting and early regulatory <br />coordination strategies that reduced project risk and <br />minimized schedule and budget impacts. <br />• Applied value engineering and stakeholder <br />coordination to balance resiliency improvements, <br />public access, habitat enhancement, and long-term <br />maintainability while maintaining budget objectives. <br />Crandon Marina North Living Shoreline, Miami-Dade <br />County <br />• Utilized an alternatives-based evaluation process <br />that considered construction costs, permitting <br />requirements, implementation feasibility, and grant <br />funding opportunities for each design alternative. <br />• Reduced permitting risk and potential mitigation costs <br />through environmental avoidance strategies and early <br />agency coordination. <br />• Developed cost-effective shoreline stabilization <br />solutions utilizing native limestone revetments, <br />offshore breakwaters, and mangrove plantings to <br />improve resiliency while controlling implementation <br />costs. <br />• Coordinated project development with anticipated <br />permitting review periods, reducing downstream <br />schedule risks and supporting efficient project <br />advancement. <br />PROVEN COST CONTROL <br />RESULTS: <br />Through value engineering, alternatives <br />analysis, proactive permitting coordination, <br />grant funding integration, and real-time <br />budget management, Cummins Cederberg <br />consistently delivers constructible, cost- <br />effective solutions that reduce project risk, <br />avoid costly redesigns, maximize available <br />funding, and keep projects moving from <br />planning through construction.
The URL can be used to link to this page
Your browser does not support the video tag.