Laserfiche WebLink
RFQ #26-07-01 | 123 <br />4.4.2 Design Services Approach <br />Our team is familiar with the requirements for undertaking the tasks outlined in the City’s RFQ. The general core processes involved in <br />carrying out an assignment or project will broadly encompass the following activities - with adjustments, as needed. <br />A. Field Review <br />At the commencement of each project, EAC will schedule a <br />field review with our team members and personnel and will <br />invite applicable assigned staff from the City. Discussions and <br />observations will be aimed at reviewing the background of the <br />project and any important issues, problems or requirements. <br />Other agencies, as deemed appropriate, may be invited only when <br />authorized by the city. <br />We will document the field review and furnish photographs of the <br />project to identify areas of concern. The field visits will serve to <br />familiarize our team with critical areas that need attention, and to <br />identify any conditions that may not have been included in the data <br />collection process. <br />B. Data Collection <br />Insert This is an extremely important element of any project. <br />Data to be collected includes as-built plans; previous feasibility <br />reports; historic aerial photographs; rainfall, storm and flow <br />records; previous studies in nearby areas; FEMA maps; existing <br />and proposed land use maps; discussions with City maintenance <br />and public works staff; and drainage permits. Also, drawings of <br />completed and proposed projects within the project area and <br />adjacent areas are often useful. <br />C. Kick-off and Brainstorming Session <br />Once our team has received substantial field data and have completed the field review, our project manager will conduct a kick-off <br />and brainstorming session where our team - including the discipline leads involved in each project or assignment –will gather to <br />discuss alternatives for the project. This meeting is typically followed by a kick-off meeting with the City to discuss our findings and <br />our approach to executing the project. <br />D. Review the Regulatory Requirements & Design Criteria <br />Our team will proceed to review federal, state, regional and local agencies having jurisdiction over development of facilities in the <br />area. These agencies may include at a minimum: FDOT; Palm Beach County; South Florida Water Management District (SFWMD); <br />Florida Department of Environmental Protection (FDEP); and local authorities. This review helps avoid developing alternatives that <br />are not feasible from the permitting or regulatory approval standpoint. <br />E. Pre-Design Services <br />Pre-design work generally includes all work needed to retrieve site specific technical data to be utilized for the engineering <br />design purposes: <br />Right-Of-Way Surveying and Mapping - Our survey consultant is familiar with City. If requested by the city for a fast track project <br />or to expedite the work, multiple crews will be deployed to gather information as part of the surveying project requirements. Our <br />surveyors will perform topography and surveying services to obtain actual locations of site features, elevations, and important <br />geometric data critical for design computations and analyses. All survey work will also comply with WUD standards, as well as the <br />Minimum Technical Standards for Surveying and Mapping - according to Chapter 5J-17.052 Florida Administrative Code, and Chapter <br />471 Florida Statutes. <br />Geotechnical Engineering & Soils Investigation - Our team’s subconsultant is also thoroughly familiar with the City. A detailed <br />geotechnical evaluation will be conducted along the project corridor for each assignment. Geotechnical elements include soil and <br />rock conditions, seasonal groundwater elevations and isolated near surface muck. Specific attention will be paid to these conditions <br />during field investigations. We will also review available geotechnical data and draw upon our experience in the project area.