Laserfiche WebLink
RFQ #26-07-01 | 36 <br />• Class V Permit - Work involving temporary dewatering <br />• Class VI Permit - Work or installation of a system that has <br />known soil or ground water contamination <br />• Water and Sanitary Sewer <br />• Sewer Extension Approval <br />• Water Extension Approval <br />• Sewer Capacity Certification <br />• Sewer Allocation Documentation <br />• Private Sanitary Sewer Operating Permits <br />• Air and Asbestos Reviews <br />• Air Construction Permit <br />• Air Operating Permit <br />• Asbestos - Demolition Permit <br />• Other Permit Types - such as Tree Removal Permit, Industrial <br />Facilities (IW5) Permit, Industrial Facilities (IW6) Permit and <br />Storage Tank Removal Permit <br />2.4.2 Miami-Dade Department of Transportation and Public Works (DTPW) <br />EAC’s experience with Miami-Dade DTPW is also extensive and long lasting. We have secured review <br />approvals and have permitted roadway and bridge improvements - such as pavement markings, <br />channelization, traffic signalization, stormwater designs, and roadway lighting projects with the agency. <br />2.4.3 Miami-Dade County Health Department <br />EAC has extensive experience with Miami-Dade County Health Department’s Environmental Health and <br />Engineering Division. This division’s primary goal is to assure a safe and healthy environment for Miami- <br />Dade County - by providing review, oversight, and issuance of construction permits for infrastructure <br />projects. EAC has secured the following types of permits from this department: <br />• Water and Sanitary Sewer <br />• Drinking Water Construction <br />• Onsite Sewage Treatment and Disposal System Application for Construction <br />2.4.4 Miami Dade Water and Sewer <br />EAC has over 25 years of experience working with the Miami-Dade Water and Sewer Department (MDWASD), <br />designing and permitting water and sewer projects for both public and private clients. We are thoroughly <br />familiar with the steps and processes required to secure permits from MDWASD. <br />2.4.5 Miami Dade Fire Rescue Department <br />EAC has extensive experience working with Miami-Dade Fire Rescue Department (MDFR) and its Fire <br />Prevention Division. The Fire Prevention Division is responsible for conducting Certificate of Occupancy <br />(CO) inspections for commercial facilities, including new developments and renovation projects. EAC <br />coordinates with MDFR to obtain approvals for critical infrastructure improvements, including water main <br />extensions, fire hydrant placement, site access and emergency ingress/egress features, fire suppression <br />systems, and other fire protection requirements. We are thoroughly familiar with the steps and processes <br />required to secure the approvals. <br />2.4.6 South Florida Water Management District (SFWMD) <br />EAC’s experience with the SFWMD dates back to 1994 on projects requiring SFWMD regulatory review <br />for surface water management or water use permits. Since then, the relationship and familiarity with the <br />SFWMD and its staff has progressed significantly into one that has become collaborative. In addition to <br />securing approvals and permits for projects, EAC has performed services directly for the SFWMD as a prime <br />consultant through several professional services contracts, and also as a subconsultant. Since 2015, we <br />have served the District as Consultant Engineer on a multi-year continuing services contract - performing <br />miscellaneous engineering design for the agency’s Operations, Maintenance, Rehabilitation, Restoration C <br />Repair (OMRRCR) Program. <br />EAC is thoroughly familiar with the District’s regulatory requirements for water control, stormwater management, water use, water <br />consumption, water quality, and the preservation of natural ecosystems. Our engineers have successfully obtained permits for more <br />than 100 projects from the SFWMD or one of its delegated water control districts or county agencies. Our successful permits have <br />ranged from: <br />• Environmental Resource Permits (ERPs) <br />• Conceptual ERP Stormwater Master Plan Permits <br />• General Permits <br />• Minor Permit Modifications (“Letter Mods”) <br />• Consumptive Water Use Permits <br />• Right-of-Way Permits