Laserfiche WebLink
RFQ #26-07-01 | 68 <br /> <br />Name of Key Staff <br /> <br />Contract Role <br />2027 2028 2029 <br />Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 <br />Alexis Morgado Designer 90%90%90%90%90%95%95%95%95%95% <br />William Munshaw, PE Lead Engineer 90%90%90%90%90%95%95%95%95%95% <br />Andrea Rivera Traffic Planner 90%90%90%90%90%95%95%95%95%95% <br />Carlos Cuevas Designer 90%90%90%90%90%95%95%95%95%95% <br />Girish Thallapragada, PE Senior Engineer 90%90%90%90%90%95%95%95%95%95% <br />Bruno Boero, PE Lead RPR 70%70%60%65%65%65%65%65%70%70% <br />Pete McRae, PE Chief Engineer (CEI)70%70%80%85%90%90%90%90%90%90% <br />Orlando Sanchez RPR 70%70%80%85%90%90%90%90%90%90% <br />Marc Chung RPR 70%70%80%85%90%90%90%90%90%90% <br />Jonathan Somonte Lead CEI Inspector 70%70%80%85%90%90%90%90%90%90% <br />Karel Caso CEI Inspector 70%70%80%85%90%90%90%90%90%90% <br />Otto Elmer Senior CEI Inspector 70%70%80%85%90%90%90%90%90%90% <br />Julian Batista CEI Inspector 70%70%80%85%90%90%90%90%90%90% <br />Matheus Dutra, PE Designer 70%70%80%85%90%90%90%90%90%90% <br />Through proactive workload management and confirmed staff availability, <br />our team remains responsive, dedicated, and focused—ensuring <br />successful project delivery from assignment initiation through completion.