Laserfiche WebLink
RFQ #26-07-01 | 89 <br /> <br />Fritz Fenelus, PE <br />LEAD ENGINEER <br /> <br />Summary <br />Transportation Engineer with 11 years of experience in designing transportation infrastructure <br />projects. Proficient in utilizing advanced software programs for drafting and simulation. Adept at <br />collaborating with multidisciplinary teams and providing technical solutions to complex <br />challenges. Skilled at delivering timely projects, withing budget, and in compliance with all <br />applicable standards. In addition, Mr. Fenelus performed many other tasks including Long <br />Range Estimates, Scope of services, Value Engineering Studies, detailed reports, and <br />Plans/Permit Reviews. Committed to continuous professional development and staying current <br />with industry advancements. <br />East Palm Dr Phase II Canal Culverting <br />CLIENT City of Florida City / ROLE Engineer of Record <br />Project includes roadway widening, milling and resurfacing and overbuilding, proposed <br />sidewalk, lighting, and signalization, ADA upgrades (including sidewalk, curb ramps), and canal <br />culverting. Primary responsibilities include Project Management and EOR of all the roadway <br />components. <br />PortMiami Cruise Terminal G <br />CLIENT Port of Miami / ROLE Engineer of Record <br />Project includes major roadway reconstruction, minor milling and resurfacing, new parking <br />garage, proposed lighting, ADA upgrades (including sidewalk, curb ramps), and a proposed <br />bridge. Primary responsibilities include Project Management and EOR of all the roadway <br />components. <br />NE 79th Street Bridge Replacement Project <br />CLIENT FDOT District 6 / ROLE Engineer <br />Bridge replacement project along SR 934 / NE 79th Street Causeway in North Bay Village. <br />Project improvements include the replacement of four existing bridges with two new bridges that <br />are elevated to enhance resilience against sea level rise and incorporating additional protection <br />measures. The project also includes roadway widening, as well as implementation of bicycle <br />lanes, new sidewalk, curb-ramp and curb and gutter reconstruction, drainage improvements, <br />ADA upgrades, signalization and lighting improvements, signing and marking upgrades, utility <br />adjustments, subsurface utility engineering services, hydraulic modeling, and environmental and <br />drainage permitting. <br />Continuing Services <br />CLIENT Miami Dade DTPW / ROLE Lead Engineer <br />The contract included mainly intersection improvements and midblock crosswalk task work <br />orders. The scopes are a combination of milling and resurfacing, lighting retrofits, ADA upgrades <br />and signalization upgrades. Primary responsibilities include Lead Design Engineer for the <br />roadway, lighting, and signalization components. <br /> <br />11 Years of Experience <br />Education <br />MS Civil Engineering/Water <br />Resources - Florida <br />International University <br /> <br />BS Civil Engineering - Florida <br />International University <br />Professional Registrations <br />Professional Engineer: <br />Florida 88318 <br />Certifications <br />Advance Maintenance of Traffic <br />(MOT) Certification <br /> <br />Specs Package Preparation <br />Areas of Expertise <br />Roadway/Highway and <br />Drainage Design <br />Signing & Pavement Markings <br />Pavement Design <br />3D Modeling <br />