Laserfiche WebLink
RFQ #26-07-01 | 97 <br />Bruno Elage Boero, PE <br />LLEEAADD RRPPRR <br />Summary <br />Professional Civil Engineer with over 9 years of extensive experience in CEI for FDOT Districts <br />4, 6, and the Turnpike, as well as Capital Improvements construction projects. He is a valuable <br />team member with a proven track record in overseeing challenging projects, interacting with <br />various agencies, and coordinating with utility agency owners. <br />SW 21st Street Complete Street Improvements from SR-7 to SW 40th St <br />CLIENT City of West Park | ROLE Project Engineer/Project Administrator <br />Project Administrator for this $1.6 million project that 1.5-mile complete street improvement will <br />include clearing/grubbing, concrete sidewalks and ADA ramp upgrades, swale <br />regrading/sodding, drainage upgrades and adjustments, pavement milling and resurfacing, <br />pavement widening for bike lanes, and signing and pavement marking. <br />NW 11th Street Roadway Improvement <br />CLIENT City of Miami | ROLE Project Engineer/Project Administrator <br />Project Administrator for this $1 million roadway reconstruction project along NW 11th St <br />between NW 1 Avenue and NW 2 Avenue; NW 1 Avenue between NW 10 Street and NW 11 <br />Street. Construction activities include drainage, sidewalk, curb and gutter, signage and <br />pavement markings. <br />NW 13th Street Roadway Improvement <br />CLIENT City of Miami | ROLE Project Engineer/Project Administrator <br />Project Administrator for this $2.6 million roadway reconstruction project along NW 13th St from <br />NW 35th Ave to NW 37th Ave. Construction activities include drainage, sidewalk, curb and <br />gutter, signage and pavement markings. The project includes coordination with Miami-Dade <br />Water & Sewer for the installation of an 8-inch DIP from NW 35th to NW 37th Avenue. <br />Weston Rd Improvements <br />CLIENT City of Weston | ROLE Project Engineer/Project Administrator <br />This $6.1 million roadway reconstruction project along Weston Rd from Griffin Rd to Indian Trace <br />will provide road widening to accommodate additional capacity; wider bike lanes; drainage <br />improvements at select locations; sidewalks and curb ramps for ADA compliance; pavement <br />marking and signage; and associated landscape and irrigation adjustments. <br />Bonaventure Boulevard – Milling and Resurfacing <br />CLIENT City of Weston | ROLE Project Engineer/Project Administrator <br />Milling and resurfacing, replacement of pavement markings, and concrete sidewalk and curb <br />ramps rehabilitation of Bonaventure Boulevard within the project limits from Griffin Road to <br />Indian Trace. <br />Roadway Improvements to NE 2nd Ave from NE 20th St to NE 36th St <br />CLIENT Miami-Dade County DTPW | ROLE Project Engineer/Project Administrator <br />Project Manager for this $14 million Miami-Dade County Design-Build project that includes <br />roadway reconstruction, new stormwater system, sidewalks, curb and gutters, pavement <br />markings, signage, signalization, decorative lighting, and landscaping. <br />9 Years of Experience <br />Trainee ID 61972 <br />Education <br />BS Civil Engineering - Florida <br />International University <br />Licenses <br />Professional Engineer <br />Florida 92323 <br />Certifications <br />CTQP Quality Control Manager <br />CTQP Final Estimates Level 1 <br />& 2 <br />FDOT Advanced Temporary <br />Traffic Control <br />CTQP Asphalt Paving Levels 1 <br />& 2 <br />CTQP Concrete Field Tech. <br />Level 1 <br />CTQP Earthwork Construction <br />Inspection Levels 1 & 2 <br />CTQP Drilled Shaft Inspection <br />ACI Level I Concrete Field <br />Testing Tech. <br />Troxler – Nuclear Gauge Safety <br />FDEP Stormwater, Erosion & <br />Sedimentation Control Inspector