<br />CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING CONSULTING SERVICES (CCNA) RFQ 26-07-01-0-2026C
<br />3.2 Understanding the City’s Anticipated Electrical Needs
<br />City Capital Priority Programmed Value Electrical Engineering Implications
<br />Central Island Street Light
<br />Enhancements $2.0 million Photometric study, design, permitting, and installation of new poles and
<br />luminaires. The work must account for poles removed by the FPL
<br />undergrounding project and conflicts with the Central Island drainage
<br />work.
<br />Citywide Electric Vehicle Charging
<br />Stations $500,000 Site selection, load and service-capacity review, FPL coordination, charger
<br />and distribution design, parking-lot routing, accessibility, metering,
<br />controls, and operating-cost considerations.
<br />Citywide Security $5.0 million Reliable power, pathways, surge protection, network and equipment
<br />coordination, standby-power priorities, and phased implementation at
<br />City facilities and public spaces.
<br />Collins Avenue Street Light
<br />Enhancements $1.475 million Conversion of obsolete high-pressure sodium lighting to LED, supported
<br />by a photometric study and evaluation of additional pole locations, energy
<br />use, and maintainability.
<br />Gateway Park Center Garage Solar
<br />Improvements $4.0 million Solar canopy systems that offset FPL costs, supply the building and EV
<br />chargers, provide shade, and require structural, utility-interconnection,
<br />electrical distribution, and protection coordination.
<br />Pedestrian / Emergency Bridge Power
<br />Relocation $2.014 million Relocation of an FPL transformer and associated equipment, with utility
<br />scheduling and easement coordination as controlling project
<br />dependencies.
<br />Fleet Services Compound / Public Works
<br />Annex $2.0 million / $3.5
<br />million Electrical service, lighting, power, equipment connections, exterior
<br />systems, security, permitting, and construction phasing for City
<br />operational facilities.
<br />Prior CIP: Gateway Park Generator and
<br />Government Center Solar $1.5 million / $1.0
<br />million The City’s prior CIP confirms continuing demand for standby generation,
<br />renewable energy, FPL cost reduction, and power for public EV charging.
<br />
<br />The City’s larger drainage and utility programs also include pump stations, controls, generators,
<br />underground electrical facilities, and utility interfaces. ECF recognizes that any assignment issued under
<br />this continuing contract must remain within the applicable CCNA thresholds and the specific scope
<br />authorized by the City.
<br />3.4 Electrical Engineering Services Available to the City
<br />• Electrical system studies, condition assessments, facility recertification support, code-deficiency
<br />evaluations, load studies, and capital replacement planning.
<br />• Utility service planning, FPL load letters and applications, transformer and metering coordination,
<br />easement and service-point coordination, and outage planning.
<br />• Power distribution design, service and feeder upgrades, switchboards, panelboards, transformers,
<br />grounding and bonding, surge protection, and selective-coordination support.
<br />• Standby generators, automatic transfer switches, emergency distribution, critical-load prioritization,
<br />temporary power planning, and operational sequencing.
<br />• Street, park, parking lot, garage, sports-field, pedestrian, and building lighting, including photometric
<br />calculations, LED conversion, controls, and code compliance.
<br />• Electric vehicle charging infrastructure, including capacity analysis, charger selection criteria,
<br />distribution, metering, network and payment-system coordination, and future expansion planning.
|