My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Edgewater Group Bid Document (39)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Edgewater Group
>
Edgewater Group Bid Document (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:12:24 PM
Creation date
8/31/2026 1:11:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sanford Marina <br />Project 04 Location: Sanford, FLName of Client: City of Sanford FloridaComplete Project Construction Cost: $17M (Ongoing)Name and Contact Information of Owner’s Project Manager: Craig RadzakAmount of Funding: FEMA Grant Application $17MEDA Grant Application $3M <br />Ongoing project. Operation On Schedule. No <br />change orders <br />Derelict Boats Illegal Sanitary Discharge <br />F3 Marina <br />Fort Lauderdale <br />Project 01 <br />2. Qualifications <br />Owner: Southern MarinasProject Address: 1335 SE 16th St, Fort Lauderdale, FL 33316Contact Phone: (414) 271-1111Project Status: Completed in 2021 <br />7RFQ #26-07-01 Edgewater Group <br />The F3 Marina Project is the first fully automated dry <br />stack boat storage facility open to the public. Located <br />on Fort Lauderdale’s 16th street canal, the Club includes <br />over 245 dry slips capable of holding vessels up to 43 <br />feet in overall length, with an additional 20 wet slips <br />that serve as a queuing area for boaters. <br />This state-of-the-art facility offers vessel storage and <br />provisioning, marina fuel, pump-out, and shore power <br />service that is equipped with a marina guard protection <br />system to comply with national best practices. <br />The project required demolition of an existing building, <br />replacement of the existing seawall, installation of a <br />new floating dock system, and construction of the <br />new storage facility. The boater service amenities <br />include restrooms, a lounge area, storage lockers, a <br />fish cleaning station, and viewing areas for boaters to <br />observe the automated crane system operating. <br />Edgewater was retained by F3 Marinas to provide marine <br />and civil engineering design, landscape architecture <br />services, and direct the permitting & approvals process <br />for the project. <br /> <br />About the Project
The URL can be used to link to this page
Your browser does not support the video tag.