My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Edgewater Group Bid Document (39)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Edgewater Group
>
Edgewater Group Bid Document (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:12:24 PM
Creation date
8/31/2026 1:11:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Staffing <br />City of Riviera Beach Qualifications for Marine/Marina Consulting Services <br />Ronald Schults, P.E. | CEO <br />Port of Rochester Marina (Rochester, NY) <br />Ron led planning and engineering for a 180-slip marina and public waterfront park along the Genesee <br />River. The project included site utility coordination, shoreline protection design, dock system engineering, <br />anchorage and buoyancy calculations, ADA compliance, and multi-agency regulatory approvals. <br />Harbor Village at Harbor Shores (St. Joseph, MI) <br />Ron served as principal engineer for this waterfront development, overseeing engineering design, <br />permitting, code compliance, marina layout, stormwater infrastructure, roadway planning, and marina <br />utility systems including electrical and potable water distribution. <br />East Tawas State Harbor (East Tawas, MI) <br />Ron supervised planning, design, and permitting of a multi-phase marina redevelopment project for the <br />Michigan Department of Natural Resources. The project included market feasibility studies, dock design, <br />utility system planning, marina layout, and regulatory coordination for an 80+ slip floating dock marina <br />facility. <br />Town of Palm Beach Municipal Marina (Palm Beach, FL) <br />Ron provided principal oversight for environmental permitting and regulatory approvals associated with <br />the Town of Palm Beach public marina dock replacement project, including coordination of FDEP ERP <br />permitting, submerged lands leasing, and U.S. Army Corps of Engineers approvals. <br />31st Street Harbor (Chicago, IL) <br />Ron led marina engineering for the nationally recognized 31st Street Harbor redevelopment in Chicago. <br />Responsibilities included dock structure design, buoyancy and stability calculations, marina utilities <br />engineering, ADA compliance, and construction oversight. The project received numerous national awards <br />for sustainable waterfront design. <br />Gateway Harbor (Chicago, IL) <br />Ron led the engineering team for development of a new 250-slip destination harbor for the Chicago Park <br />District adjacent to Navy Pier. The $55 million project included reconstruction of the historic Dime Pier and <br />incorporated sustainable design strategies, habitat creation, and public waterfront access. <br />Harbor Village at Manistee Beach (Manistee, MI) <br />Ron served as project engineer and development partner for this $150 million mixed-use waterfront <br />development that includes marina facilities, residential development, and commercial uses. The 66-acre <br />project has been constructed in multiple phases and has significantly transformed the Manistee waterfront <br />International Marina Development Experience <br />Ron has led marina feasibility studies, master planning, and engineering design for major international <br />waterfront developments across Europe, Asia, the Caribbean, and the Middle East. Representative <br />projects include: <br />• Dun Laoghaire Marina – Dublin, Ireland (820-berth marina) <br />• Caroline Bay Marina – Bermuda (America’s Cup marina redevelopment) <br />• Ara Macao Resort & Marina – Belize (600-acre resort and marina development) <br />• Marina Santa Cruz Resort – La Paz, Mexico (500-slip megayacht marina and resort) <br />• Port Dickson Marina – Malaysia (900-slip marina master plan) <br />• Seenu Atoll Marina – Maldives (resort marina master plan) <br />• Puerto Azul Marina – Philippines (400-slip marina development) <br />20RFQ #26-07-01 Edgewater Group
The URL can be used to link to this page
Your browser does not support the video tag.