Laserfiche WebLink
3. Staffing <br />City of Riviera Beach Qualifications for Marine/Marina Consulting Services <br />Erik Schults, P.E. | President <br />Erik Schults serves as President of Edgewater Group LLC, where he leads the firm’s <br />engineering, coastal planning, architecture, and landscape architecture teams. In <br />this role, he oversees project delivery, firm operations, and strategic growth initiatives <br />while working closely with the Business Development Director and Business/ <br />Accounting Manager to guide the company’s operational and financial performance. <br />Mr. Schults collaborates regularly with Ron Schults, PE, Principal, on company <br />leadership, project strategy, and technical oversight. He is responsible for directing <br />multidisciplinary project teams and ensuring the successful execution of complex <br />waterfront and coastal infrastructure projects throughout the United States and <br />Caribbean. <br />Mr. Schults earned a Bachelor of Science in Civil Engineering from Michigan <br />Technological University with concentrations in structural and geotechnical <br />engineering. He began working with Edgewater in 2014 and assumed full-time <br />responsibilities in 2019. <br />His professional experience includes marina planning and design, shoreline <br />stabilization, marine structural assessment and rehabilitation, bathymetric and <br />hydrographic surveying, navigation and dredging support, and construction <br />administration. Mr. Schults has worked on marine facility projects across Florida, <br />Michigan, New York, the Caribbean, and the Gulf Coast. Earlier in his career he <br />supported the U.S. Army Corps of Engineers on projects involving environmental <br />monitoring of dredged material placement, pier renovation monitoring, dam <br />removal, and construction oversight. <br />Education <br />B.S. Civil Engineering with <br />Honors, 2020. <br />Michigan Technological <br />University <br />Certifications <br />Professional Engineer <br />American Concrete Institute <br />ACI Concrete Field Testing <br />Technician – Grade I, 2018 <br />USACE certified Construction <br />quality management for <br />contractors <br />OSHA 10 hour <br />ASCE Member <br />Part 107 Certified Commercial <br />Drone Pilot <br />Other Projects <br />Compass Landing by <br />Margaritaville <br />Melbourne, FL <br />Palm Harbour Marina <br />Cape Haze, FL <br />Boss Oyster Marina <br />Apalachicola, FL <br />Abaco Orange Beach <br />Orange Beach, AL <br />F3 Marina <br />Ft. Lauderdale, FL <br />Bass Pro Shops <br />Islamorada, FL <br />Billfish Bay Marina <br />Orange Beach, AL <br />Santa Cruz Marina Resort <br />La Paz, Mexico <br />Project Experience <br />Compass Landing By Margaritaville (Melbourne, FL) <br />Compass Landing by Margaritaville is a $111 million waterfront resort <br />redevelopment in Melbourne, Florida, transforming a former multi-use marina <br />facility into a destination resort featuring a hotel, restaurants, event space, <br />waterfront promenade, and marina. Edgewater Group has been involved since <br />project inception, providing feasibility analysis, permitting, engineering design, <br />bidding support, and construction administration. Erik led permit coordination, <br />preliminary and final engineering design, construction document preparation, <br />bid support, contract negotiations, and construction oversight for the project’s <br />226-slip marina and waterfront promenade, which are currently under <br />construction. <br />Downtown Sanford Marina (Sanford, FL) <br />The Downtown Sanford Marina is a city-owned and privately managed facility <br />originally constructed in the 1960s and expanded over time to include a 159- <br />boat dry stack facility and 269 wet slips. Erik conducted a comprehensive <br />condition assessment and has worked with the City of Sanford to develop a <br />long-term redevelopment strategy to modernize the marina and establish it <br />as a waterfront destination. His work has included public design charrettes, <br />economic impact analysis, marina master planning, and permitting. Following <br />hurricane damage, he has also assisted the City with FEMA funding coordination <br />and emergency repair permitting.Contact <br />erik@edgewater.pro <br />21RFQ #26-07-01 Edgewater Group