Laserfiche WebLink
3. Staffing <br />Erik Schults, P.E. | President <br />Palm Harbour Marina (Cape Haze, FL) <br />Palm Harbour Marina sustained significant damage during Hurricane Ian. Erik worked with the marina <br />owner to stabilize damaged infrastructure and develop a phased master plan addressing both near-term <br />repairs and long-term redevelopment opportunities, including infrastructure improvements and future <br />expansion of the marina facility. <br />Boss Oyster Transient Marina (Apalachicola, FL) <br />The Boss Oyster Transient Marina is a fully transient marina facility located in Apalachicola, Florida. <br />Edgewater prepared a marina master plan and assisted the owner with preparation of a $1.5 million Boating <br />Infrastructure Grant (BIG) application. Erik supported the planning process, marina design concepts, and <br />grant documentation. <br />Abaco Orange Beach (Orange Beach, AL) <br />This waterfront development includes a 258-slip marina serving residential and commercial uses in Orange <br />Beach, Alabama. Erik has managed the project from preliminary design through permit submission and is <br />leading the upcoming final design and construction administration phases. <br />Bonita Springs Private Dock Expansion (Bonita Springs, FL) <br />Engineering services were provided for the expansion of an existing condominium marina facility to <br />approximately 15 slips. Erik evaluated alternative design concepts, coordinated with regulatory agencies, <br />and is leading permitting and final engineering for the proposed marina improvements. <br />F3 Marina – Automated Dry Stack Marina (Fort Lauderdale, FL) <br />This state-of-the-art facility will be the first fully automated public dry stack marina in the region, located on <br />the 16th Street Canal in Fort Lauderdale within one mile of Port Everglades ocean access. Erik is supporting <br />the multidisciplinary design team on engineering coordination for the $25 million redevelopment, which <br />includes a fully integrated marina facility and supporting infrastructure. <br />Bass Pro Shops / Islamorada Fish Company (Islamorada, FL) <br />Erik supported construction oversight of bulkhead and pier reconstruction at the Islamorada waterfront <br />site. He also participated in bathymetric survey efforts and produced pre- and post-dredge survey exhibits <br />along with comparative dredge volume analyses used to verify contractor dredging quantities. <br />Billfish Bay Marina and Waterfront (Orange Beach, AL) <br />The Waterfront at Billfish Bay will transform the final undeveloped parcel on Terry’s Cove into a major <br />waterfront destination featuring an 800-boat automated dry stack marina, 125 wet slips, residential units, <br />retail space, restaurants, and a public promenade. Erik prepared preliminary engineering drawings for the <br />multi-story automated dry stack facility and coordinated with crane manufacturers during the design-bid <br />procurement process. <br />Santa Cruz Marina Resort (La Paz, Mexico) <br />Erik developed financial analysis tools to evaluate marina development feasibility and investment <br />performance. His work included preparing cash flow projections, calculating internal rates of return, and <br />developing financial models used in presentations to potential investors. <br />22RFQ #26-07-01 Edgewater Group