Laserfiche WebLink
management of all submittals, requests for information, and <br />contractors’ payment applications, running weekly progress <br />meetings and mitigating project cost overruns, and claims. The <br />project was completed on time and on budget in 2019. <br />Trap Dock Reconstruction, Chatham, MA. Project Engineer <br />oversaw all the design and construction for Trap Dock <br />Reconstruction at the Chatham Trap Dock. The reconstruction <br />project for the Town of Chatham called for complete removal, <br />and reconstruction of a new modern fishing pier designed <br />to meet and exceed climate resiliency as well as suit the <br />needs of the local fishermen. The new pier was design with a <br />tropical hardwood greenheart pile foundation, concrete deck <br />with stainless steel hardware and composite bulkheads and <br />fendering to maximize the longevity of the new structure, as <br />well as limit the impact to the adjacent environment. <br />University of Massachusetts Boston, Harborwalk & <br />Shoreline Stabilization Project, Boston, MA. Project Engineer <br />responsible for the site inspection and design of shoreline <br />stabilization for the connection of the Boston Harborwalk <br />between the JFK Library and Old Harbor Park. Performed the <br />wave and wake analysis incorporating sea level rise to design <br />the shoreline protection. <br />Fort Point Road and Fore River Avenue Seawalls, <br />Weymouth, MA. Project Engineer participated in the <br />investigation and assessment of these aging seawalls and <br />revetments on the Fore River. Effort included wave analysis, <br />development of design waves, assessment of overtopping <br />impacts, armor stone sizing and design of new revetments and <br />seawalls. <br />Wild Harbor Bulkhead, Falmouth, MA. Project Engineer and <br />performed design of this steel bulkhead replacing an existing <br />deteriorated timber bulkhead in Wild Harbor, Falmouth. The <br />proposed bulkhead was a cantilever design and the analysis <br />included an assessment of the impacts of scour on bulkhead <br />stability. <br />MassDevelopment - Jodrey Pier Commercial Marina <br />Expansion, MA. Project included inspection, assessment and <br />design of expansion of commercial marina and fender system <br />repairs for an existing pier. Project Engineer and performed <br />inspection of the existing floats and pier fender system, <br />design of marina expansion as well as the fender system <br />improvements that included fender pile replacement with <br />Greenheart piles and new timber camels. <br />Rhode Island Fast Ferry, North Kingstown, RI. Project <br />Engineer developed design parameters for this new ferry dock <br />including wave analysis and assessment of the impacts on the <br />proposed ferry berth. Effort included development of design <br />waves, assessment of breakwater overtopping and wave load <br />analysis on the shoreline structures. <br />Morris Island Cut Dredging, Chatham, MA. Project Engineer <br />and performed hydrographic survey and eel grass survey at <br />Morris Island Cut and developed survey plans. Based on survey <br />findings, performed dredge design and estimation of dredge <br />volumes to develop project plans suitable for regulatory <br />applications. <br />Bass River Dredge Study, Beverly, MA. Project Engineer <br />to perform a hydrographic survey in accordance with U.S. <br />Army Corps of Engineers/ Massachusetts Department <br />of Conservation & Recreation waterways standards for <br />hydrographic surveys, gathered input from river stakeholders <br />and reviewed historic data. <br />New Bedford State Pier Emergency Repairs, New Bedford, <br />MA. Project Engineer oversaw all the design and construction <br />for the inspection, design and construction of the Emergency <br />Repairs of the New Bedford State Pier East and South Wharfs. <br />This project was performed to restore the piers structural <br />capacity for import/ export operations for the 2019 season. <br />14. MacMillan Wharf Facility Assessment, Provincetown, <br />MA. Project Engineer/Diver participated in the above and <br />underwater investigation and assessment of Provincetown’s <br />commercial waterfront facilities including assessment of <br />concrete piers, passenger vessel berthing barge, float system, <br />fender system and mooring fixtures. <br />Island-wide Underwater Inspections, Bermuda. Project <br />Engineer/Diver for the inspection of the underwater foundation <br />elements of many of the island’s bridges, ferry landings <br />and offshore beacons. The information accumulated in the <br />investigation was presented in reports to the Ministry of Works <br />and Engineering. <br />Massachusetts Port Authority, Moran Terminal Repair, <br />Charlestown, MA. Project Engineer/Diver evaluating the <br />current condition and determining the effort required to <br />rehabilitate the facility to a functional level. Developed the <br />vessel loading criteria and determination of requirements for <br />the lateral design. Efforts for the project included performance <br />of above and underwater inspection and assessment of the <br />pier’s 2000-foot perimeter concrete structural slab and steel <br />pile foundation. The investigation included determination of <br />improvements required to achieve the original live loading as <br />well as reduced live loading scenarios of the 50+ year old pier <br />along with the estimated construction costs. Project is now in <br />construction of recommended repairs and upgrades. <br />Jordan Pier, Dartmouth, MA. This project included inspection, <br />assessment and design of repairs for an existing pier exposed <br />to significant waves. Served as the Project Engineer and <br />performed inspection of the existing pier, oversight of rock <br />coring and analysis and assessment of the pier. Performed <br />wave analysis and design of repairs including rock anchors <br />to stabilize the existing structure. Effort also included the <br />preparation of construction documents. <br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 86 <br />Kevin D. Buruchian, EIT