management of all submittals, requests for information, and
<br />contractors’ payment applications, running weekly progress
<br />meetings and mitigating project cost overruns, and claims. The
<br />project was completed on time and on budget in 2019.
<br />Trap Dock Reconstruction, Chatham, MA. Project Engineer
<br />oversaw all the design and construction for Trap Dock
<br />Reconstruction at the Chatham Trap Dock. The reconstruction
<br />project for the Town of Chatham called for complete removal,
<br />and reconstruction of a new modern fishing pier designed
<br />to meet and exceed climate resiliency as well as suit the
<br />needs of the local fishermen. The new pier was design with a
<br />tropical hardwood greenheart pile foundation, concrete deck
<br />with stainless steel hardware and composite bulkheads and
<br />fendering to maximize the longevity of the new structure, as
<br />well as limit the impact to the adjacent environment.
<br />University of Massachusetts Boston, Harborwalk &
<br />Shoreline Stabilization Project, Boston, MA. Project Engineer
<br />responsible for the site inspection and design of shoreline
<br />stabilization for the connection of the Boston Harborwalk
<br />between the JFK Library and Old Harbor Park. Performed the
<br />wave and wake analysis incorporating sea level rise to design
<br />the shoreline protection.
<br />Fort Point Road and Fore River Avenue Seawalls,
<br />Weymouth, MA. Project Engineer participated in the
<br />investigation and assessment of these aging seawalls and
<br />revetments on the Fore River. Effort included wave analysis,
<br />development of design waves, assessment of overtopping
<br />impacts, armor stone sizing and design of new revetments and
<br />seawalls.
<br />Wild Harbor Bulkhead, Falmouth, MA. Project Engineer and
<br />performed design of this steel bulkhead replacing an existing
<br />deteriorated timber bulkhead in Wild Harbor, Falmouth. The
<br />proposed bulkhead was a cantilever design and the analysis
<br />included an assessment of the impacts of scour on bulkhead
<br />stability.
<br />MassDevelopment - Jodrey Pier Commercial Marina
<br />Expansion, MA. Project included inspection, assessment and
<br />design of expansion of commercial marina and fender system
<br />repairs for an existing pier. Project Engineer and performed
<br />inspection of the existing floats and pier fender system,
<br />design of marina expansion as well as the fender system
<br />improvements that included fender pile replacement with
<br />Greenheart piles and new timber camels.
<br />Rhode Island Fast Ferry, North Kingstown, RI. Project
<br />Engineer developed design parameters for this new ferry dock
<br />including wave analysis and assessment of the impacts on the
<br />proposed ferry berth. Effort included development of design
<br />waves, assessment of breakwater overtopping and wave load
<br />analysis on the shoreline structures.
<br />Morris Island Cut Dredging, Chatham, MA. Project Engineer
<br />and performed hydrographic survey and eel grass survey at
<br />Morris Island Cut and developed survey plans. Based on survey
<br />findings, performed dredge design and estimation of dredge
<br />volumes to develop project plans suitable for regulatory
<br />applications.
<br />Bass River Dredge Study, Beverly, MA. Project Engineer
<br />to perform a hydrographic survey in accordance with U.S.
<br />Army Corps of Engineers/ Massachusetts Department
<br />of Conservation & Recreation waterways standards for
<br />hydrographic surveys, gathered input from river stakeholders
<br />and reviewed historic data.
<br />New Bedford State Pier Emergency Repairs, New Bedford,
<br />MA. Project Engineer oversaw all the design and construction
<br />for the inspection, design and construction of the Emergency
<br />Repairs of the New Bedford State Pier East and South Wharfs.
<br />This project was performed to restore the piers structural
<br />capacity for import/ export operations for the 2019 season.
<br />14. MacMillan Wharf Facility Assessment, Provincetown,
<br />MA. Project Engineer/Diver participated in the above and
<br />underwater investigation and assessment of Provincetown’s
<br />commercial waterfront facilities including assessment of
<br />concrete piers, passenger vessel berthing barge, float system,
<br />fender system and mooring fixtures.
<br />Island-wide Underwater Inspections, Bermuda. Project
<br />Engineer/Diver for the inspection of the underwater foundation
<br />elements of many of the island’s bridges, ferry landings
<br />and offshore beacons. The information accumulated in the
<br />investigation was presented in reports to the Ministry of Works
<br />and Engineering.
<br />Massachusetts Port Authority, Moran Terminal Repair,
<br />Charlestown, MA. Project Engineer/Diver evaluating the
<br />current condition and determining the effort required to
<br />rehabilitate the facility to a functional level. Developed the
<br />vessel loading criteria and determination of requirements for
<br />the lateral design. Efforts for the project included performance
<br />of above and underwater inspection and assessment of the
<br />pier’s 2000-foot perimeter concrete structural slab and steel
<br />pile foundation. The investigation included determination of
<br />improvements required to achieve the original live loading as
<br />well as reduced live loading scenarios of the 50+ year old pier
<br />along with the estimated construction costs. Project is now in
<br />construction of recommended repairs and upgrades.
<br />Jordan Pier, Dartmouth, MA. This project included inspection,
<br />assessment and design of repairs for an existing pier exposed
<br />to significant waves. Served as the Project Engineer and
<br />performed inspection of the existing pier, oversight of rock
<br />coring and analysis and assessment of the pier. Performed
<br />wave analysis and design of repairs including rock anchors
<br />to stabilize the existing structure. Effort also included the
<br />preparation of construction documents.
<br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 86
<br />Kevin D. Buruchian, EIT
|