Laserfiche WebLink
Paul D. Landers, PE <br />Senior Project Manager <br />Paul Landers has 26 years of experience as a geotechnical engineer focused on the design <br />and construction of projects in the transportation, water and wastewater treatment, <br />environmental, commercial, and military markets. He has extensive experience with the <br />design of deep foundations, ground improvement systems, protection of adjacent structures, <br />and temporary shoring systems. His key strengths include developing innovative solutions to <br />challenging problems and quality control reviews. <br />PROJECT EXPERIENCE <br />Bridge Fender System Analysis, Multiple Projects in Lake, Volusia, Miami-Dade, and <br />Palm Beach County, FL: Analysis and design of bridge fender systems following the Florida <br />Department of Transportation Structures Design Guide Volume 1 Section 3.14.D using the <br />computer program, FB-Multipier, developed by the Bridge Software Institute at the University <br />of Florida. This design procedure confirms that the fender system is capable of satisfying the <br />energy requirements identified by the designer for vessel impacts. Design was provided for <br />value-engineered alternate bid systems representing the material supplier of fiber reinforced <br />polymer piles and components. Scope ranged from preliminary/concept analysis, through <br />final design submissions and plan set preparation. Construction engineering was also <br />provided to confirm as-built conditions satisfied the required design intent. <br />National Capitol Seawall Rehabilitation, HDR Engineering, Washington, DC: Served as <br />the lead geotechnical engineer for the design of replacement seawalls around the eastern <br />portion of the Tidal Basin. Designed and oversaw the subsurface investigation that included <br />traditional soil borings along with CPT and DMT testing. Ground monitoring instruments, <br />including inclinometers, nested piezometers, ground monitoring points, and borehole <br />extensometers, were installed in the boreholes in the Tidal Basin as well as in the borehole <br />drilled in West Potomac Park. Provided pile design and seawall design recommendations <br />to the design team. Also provided constructability reviews for the deep foundations which <br />consisted of micropiles socketed into the bedrock. Helped the team prepare the RFP for the <br />design/build contract. <br />District Wharf DC Phase 2, Wharf Development Group, Washington, DC: Project manager <br />for this multi-year contract which involved the combined geotechnical and environmental <br />investigation programs for the construction of five new commercial and residential <br />buildings sitting on a combined below grade parking structure located directly adjacent <br />to the Washington Channel waterway and crossing over and adjacent to the WMATA Green <br />Line Metro Tunnel. Also managed the geotechnical investigations in the water to provide <br />design recommendations for a new bulkhead and several fixed and floating pier structures. <br />Developed geotechnical design recommendations for the building foundations and the <br />maritime structures. The building foundations consisted of shallow foundations bearing on <br />rigid inclusion ground improvement in the two-level parking garage and shallow foundations <br />bearing directly on native soils in the three-level parking garage. Managed the design of <br />the support of excavation system used for permitting and construction supporting the <br />Washington Channel, a 9-foot diameter DC Water outfall pipe, and adjacent structures. <br />Assisted in the implementation and assessment of an instrumentation system installed and <br />monitored by GEI for the WMATA tunnels, the SOE system, adjacent structures, groundwater <br />levels, ground vibrations, utility monitoring points, inclinometers, and strain gages. <br />RiverRenew Combined Sewer Outfall Program, AlexRenew Enterprises, Alexandria, VA: <br />Project manager overseeing a multi-year contract consisting of the subsurface investigation <br />program, development of geotechnical and environmental data reports, the development <br />of project technical specifications, and the protection of adjacent structures. This project <br />involves the design and construction of new deep tunnels to collect combined sewer <br />overflow from the four main outfall structures in the City of Alexandria. Historic geotechnical <br />and environmental information was collected and compiled into a common gINT enterprise <br />database as well as a GIS database. A 3D subsurface model was developed based on all <br />EDUCATION <br />B.S., Civil Engineering, <br />Virginia Polytechnic Institute <br />& State University <br />Coursework, Geotechnical <br />Engineering, Virginia Tech <br />INDUSTRY/GEI EXPERIENCE <br />26 years/9 years <br />REGISTRATIONS & LICENSES <br />Professional Engineer, VA. No. <br />0402038983 <br />TRAINING & <br />CERTIFICATIONS <br />10-Hour OSHA Safety <br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 101