|
Alan D. Pepin, PE
<br />Waterfront Engineer, Diver
<br />Alan Pepin specializes exclusively in waterfront projects and is an experienced project
<br />manager for above- and below-water facility inspections, material conditions and design of
<br />marine structures. His experience includes inspections of steel bulkheads, timber piers and
<br />wharfs as well as concrete and stone seawalls. Design experience includes passenger ferry
<br />berthing facilities, cruise ship berthing, large ship fender systems, pile supported structures,
<br />bulkheads and other earth retaining systems, design of steel barges, and aluminum ramping
<br />systems to meet ADA and Massachusetts Architectural Access Board requirements for
<br />passenger vessel services.
<br />Mr. Pepin’s experience also includes the preparation of contract documents including
<br />contract drawings, technical specifications and bid documents. Mr. Pepin is currently the
<br />project manager on a $30 million container terminal repair project to upgrade an existing
<br />berth to allow vessel berthing of post-Panama size vessels.
<br />PROJECT EXPERIENCE
<br />General Waterfront Engineering
<br />Conley Terminal - Berth 10 Deep Draft Berth, Massachusetts Port Authority, South
<br />Boston, MA: Performed QA/QC and constructability review of a new 1,275-linear-foot Steel
<br />Pile Supported Heavy Load Pier (1,000PSF) and deepening program for the 10,000 TEU
<br />container vessels. In addition, served as the Project Manager to oversee all construction
<br />activities associated with this project. The pier provides a fender and mooring system along
<br />with a 65 Ton Ship to Shore Crane Rail Foundation with provision to load these cranes from
<br />the delivery vessel onto the new pier in one piece. The design includes a new steel sheet pile
<br />bulkhead and is currently under construction with a cost of $120 million. Mr. Pepin is serving
<br />as the construction project manager with a completion in 2021.
<br />Berth 11 and 14 Structural Assessment and Rehabilitation, Massport, Boston, MA:
<br />Served as Senior Team Leader for inspection and coordination of the underwater inspection
<br />of over 2,500 timber foundation piles for the pier deck, over 200 steel foundation piles for
<br />the crane rails, and approximately 1000 linear feet of steel/timber bulkhead. The inspection
<br />findings were used to assess the structural capacity of the existing pier, as well as develop
<br />repair/improvement alternatives.
<br />New In-Gate & Out Gate Facilities, Massachusetts Port Authority, South Boston, MA:
<br />Performed QA/QC and constructability review for the design of a 1-mile-long roadway
<br />reconstruction project within the secure terminal as well as the replacement of the steel
<br />bulkhead and deck strengthening. Mr. Pepin also served as the construction project manager
<br />of the $35 million project including document control through Massport’s document sharing
<br />portal.
<br />T Wharf Replacement, Town of Plymouth, Plymouth, MA: Performed site inspection
<br />of the existing facility and design of the replacement piers for use by commercial fishing
<br />vessels. Effort included design of concrete piers, jib cranes, timber boardwalk together with
<br />development of contract drawings and technical specifications.
<br />Bulkhead Replacement, Town of Orleans, Orleans, MA: Oversaw the existing site
<br />investigation and was responsible for design of the 270 linear feet of steel sheet pile bulkhead
<br />with tiebacks, timber pier, and preparation of contract drawings and technical specification.
<br />Provided review of construction phase documents and assistance during the construction
<br />phase.
<br />Bulkhead Repair, Braintree Electric, Braintree, MA: Performed inspection of steel sheet
<br />pile bulkhead documenting significant corrosion and poor condition followed by analysis
<br />and development of design alternatives for the bulkhead replacement. Prepared contract
<br />drawings and technical specifications and, during construction, performed periodic
<br />inspection of the new steel sheet pile retaining wall installation including the reuse of the
<br />existing tie-back system with new tie rods.
<br />EDUCATION
<br />B.S., Civil Engineering,
<br />Merrimack College
<br />INDUSTRY/GEI EXPERIENCE
<br />16 years/16 years
<br />REGISTRATIONS & LICENSES
<br />Professional Engineer, CT
<br />No. 34608, MA No. 51177, MD
<br />No. 53327, ME No. 15810 , NJ
<br />No. 24GEO5683500, NY No.
<br />101636 , RI No. 13138, VA No.
<br />0402060024
<br />TRAINING &
<br />CERTIFICATIONS
<br />OSHA 10 hr. Construction
<br />Course
<br />PADI Certifications - 2009
<br />Open-Water Scuba Diving
<br />Dry Suit Diver
<br />Transportation Worker
<br />Identification Credential
<br />(TWIC)
<br />FHWA – NHI Underwater
<br />Bridge Inspection
<br />LPA Certification Course -
<br />Maine DOT
<br />Waterfront Edge Design
<br />Guidelines Professional
<br />Course (WEDG)
<br />PROFESSIONAL
<br />AFFILIATIONS
<br />American Society of Civil
<br />Engineers
<br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 107
|