Laserfiche WebLink
Charlestown Navy Yard New Ferry Landing, National Park <br />Service, Charlestown, MA: Responsible for the structural <br />design of a new passenger vessel berthing facility at the <br />Charlestown Navy Yard. Design included an aluminum ramping <br />system to meet ADA and MAAB accessibility requirements and <br />a new 30’X70’ steel barge in accordance with ABS standards for <br />barges. Also performed review and approval of construction <br />phase submittals. <br />Mystic Pier One Repairs, Massport, Boston, MA: Lead the <br />field inspection team in the above and below water condition <br />survey and determination of level of effort required to <br />rehabilitate this facility to a functional level. Effort included <br />the review and assessment of previous investigations, <br />assessment of the pier’s 2,000-foot perimeter concrete <br />structural slab and steel pile foundation and design of repairs. <br />Black Falcon Cruise Terminal, Massport, Boston, MA: <br />Performed many tasks on this project including Berthing <br />analysis for cruise ships and final design of fender system, <br />Mooring analysis of cruise ships to determine bollard <br />requirements, providing as on-site resident engineer during <br />construction, review and approval of shop drawings, and <br />underwater inspection of completed work. <br />Marine Terminals <br />Salem Wharf, City of Salem, Salem, MA: Performed analysis <br />and design of a new steel pile supported concrete pier with <br />an integrated wave attenuator. Designed precast prestressed <br />concrete slabs supported by precast concrete pile caps. Work <br />included working with drainage subconsultant to ensure pier <br />retains ADA and MAAB requirements as well as access routes <br />for both vehicular and pedestrian access. <br />Marine Terminal Facility Assessment and Mooring Analysis, <br />CITGO, Braintree, MA: Performed underwater investigation <br />and assessment of CITGO’s marine terminal facility including <br />assessment of mooring and berthing dolphins; timber access <br />piers; and mooring and fendering fixtures. Several deficiencies <br />were identified, and repairs and upgrades have been designed <br />and are now in construction. Completed analysis and design <br />of the new steel pipe piled concrete pier and improved vessel <br />fendering and mooring systems. Critical aspect included <br />stabilization of partially complete work to prevent damage and <br />to minimize impacts on terminal operations. <br />Blossom Street Waterfront Facility, Lynn, MA: Performed <br />the design and analysis of the concrete panel steel pile <br />supported wave attenuator and shoreline stabilization <br />including wave loading and distribution on the wave <br />attenuator. Project is complete. <br />South Boston Water Transportation Terminal, Massport, <br />Boston, MA: Executed the design of a new major waterfront <br />passenger vessel landing hub at the World Trade Center in <br />South Boston. Project includes two steel pipe piled concrete <br />piers with aluminum ramps and platforms to transition to four <br />separate steel barges with varying freeboards. The new facility <br />is to serve as a central water transportation center serving <br />multiple ferries, excursion vessels, large and small cruise ships, <br />charter fishing vessels and yachts and comply fully with ADA <br />accessibility guidelines and MAAB accessibility regulations. <br />Project is currently under final design and construction will be <br />based on available funding. <br />Shelburne Ship Repair and Marine Railway Reconstruction, <br />Shelburne, Nova Scotia: Performed the design, analysis, <br />and layout of the concrete filled steel caissons and the steel <br />track including pre-tensioned track splices. Construction was <br />completed in September 2011. <br />Governor’s Island Berthing Facility, National Park <br />Service, New York, NY: Responsible for the structural design <br />of a new passenger vessel berthing facility on Governor’s <br />Island. Design included a timber pile supported concrete <br />access pier with an aluminum ramping system to meet ADA <br />accessibility requirements and a new 30’X100’ steel barge <br />in accordance with ABS standards for barges with multiple <br />ferry landing elevations including an adjustable bow loader <br />to accommodate existing ferries. Also performed review and <br />approval of construction phase submittals. <br />Structural <br />Vehicle Ferry Transfer Ramps, Cape Verde: Served as <br />Waterfront Engineer for design as part of a design-build team, <br />of three moveable vehicle transfer bridges to accommodate <br />existing Ro-Ro Ferries as well as a new high-speed vehicle ferry <br />for separate islands. Effort included design of standardized <br />movable ramp and support tower system, site improvements <br />including foundations and concrete transition ramp. Design <br />loading based on maximum truck loading and construction <br />vehicle loading criteria. Effort was Phase I three sites for an <br />eventual nine sites on all the major islands in Cape Verde. <br />Phase I construction was completed in February 2011. <br />MBTA Hingham Ferry Terminal, Hingham, MA: As Project <br />Manager Responsible for the structural design of a new <br />passenger vessel berthing facility at the MBTA ferry terminal <br />in Hingham. Design included a timber pile supported concrete <br />dolphins with long-span aluminum bridges. Additionally, <br />an aluminum ramping system to meet ADA and MAAB <br />accessibility requirements and three new 30’X115’ steel barge <br />in accordance with ABS standards for barges with multiple <br />ferry landing elevations to accommodate existing ferries. <br />Project is currently out for bids with a construction value of <br />$12M. Construction completion is expected end of 2025/ early <br />2026. <br />Marine Facility Investigation <br />3000 LT Marine Railway Track Design, Pictou Shipyard, <br />Pictou, Nova Scotia: Performed analysis and design of a <br />new prefabricated modular steel track system. Worked in <br />conjunction with Crandall Dry Dock Engineers. <br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 108 <br />Alan D. Pepin, PE