Laserfiche WebLink
Russell J. Titmuss, PE <br />Civil Engineer, Project Manager, Senior Structural Engineer <br />Russell Titmuss has a total of over 40 years of design and project management experience <br />gained in the USA, U.K. and Bermuda. He specializes in waterfront and coastal projects <br />with an emphasis on structural engineering. His project experience has included project <br />management, planning and design of piers and wharves, industrial and commercial <br />waterfront facilities, small boat facilities including marinas, boat ramps and docking facilities, <br />passenger ferry berthing and loading facilities, pile supported structures, bulkheads and <br />shore protection. Additional experience includes the design of dredging projects and the <br />design of aluminum ramping systems to meet ADA requirements. <br />While working in Bermuda from 1997 to 2003, Russell was responsible for implementing <br />new government projects and inspection, assessment and maintenance to government <br />bridges and docks. A major element was the responsibility for government owned bridge and <br />waterfront structures throughout the Island of Bermuda. Since arriving in the USA, Russell <br />has been working exclusively on marine and waterfront projects. <br />PROJECT EXPERIENCE <br />T Wharf Replacement, Plymouth, MA.: Project Manager, was responsible for the inspection <br />and assessment of the existing facilities and the planning and design of new expanded <br />replacement piers for use by the Plymouth commercial fishing fleet. As the lead consultant <br />for this project, Mr. Titmuss managed the design team including drainage, utilities, electrical <br />and structural design. The project included design of new piers for use by commercial fishing <br />vessels and the development of berthing layouts to accommodate seasonal slips for up to <br />40 small boats and a public dock. The design included consideration of ADA requirements <br />for small boat docks and coordination with the heavily used public boat ramp alongside the <br />project. Effort included development of alternative layouts, public consultation, permitting <br />and design, and the development of contract documents. Estimated construction cost is <br />$8,000,000. <br />Massachusetts Maritime Academy NSMV Dock Upgrade: Project Manager for this fast <br />tracked project to design, permit and perform construction of upgrades and modifications to <br />the existing training ship dock to accommodate the new NSMV vessel. The new ship required <br />higher capacity fenders, stronger moorings, major utility upgrades and other improvements <br />to provide a facility meeting heavy weather storm mooring requirements. The upgrades <br />included strengthening of the existing pile supported deck to support the much larger <br />lateral loads from berthing and mooring. The strengthening included a pipe pile supported <br />stabilization platform installed at the berthing face of the existing dock. GEI assisted the <br />Academy with grant funding and construction is now complete. <br />Wellfleet Town Pier, Wellfleet, MA: Responsible for the design and reconstruction of <br />approximately 2,000 linear feet of revetment around the perimeter of Wellfleet Town Pier <br />and design of a new boat ramp and floats. The project included complete repaving of the <br />five-acre pier including major electrical and stormwater treatment upgrades and a new <br />harborwalk around the 2,000 foot perimeter. Managed the multi-disciplinary team through <br />design, permitting, preparation of construction documents, bid support for public bidding <br />and construction inspection and management. <br />Liberty Park Marina and Ferry Terminal, Jersey City, NJ: Design of all shoreline and <br />waterfront elements of this major residential/golf course development including 950 feet of <br />new shoreline bulkhead to rehabilitate the failing seawall structures, pedestrian harborwalk, <br />a 48 slip marina with an average vessel length of 45’, and an ADA compliant passenger ferry <br />docking facility to support the development. The ferry dock included a 70-foot-long timber <br />pier connecting to the shore. As Project Manager, Mr. Titmuss was responsible for overseeing <br />design and providing construction support. <br />Mystic Pier 1, MASSPORT Charlestown, MA: Project Manager for this project to rehabilitate <br />this historic pier. Mr. Titmuss was responsible for managing the multi-disciplinary team <br />to evaluate the large building, infrastructure, utilities and pier structures. GEI performed <br />EDUCATION <br />B.Sc., Engineering, University <br />of London, U.K. <br />INDUSTRY/GEI EXPERIENCE <br />43 years/23 years <br />REGISTRATIONS & LICENSES <br />Professional Structural <br />Engineer, MA No. 46514 <br />Chartered Engineer, U.K. <br />Institution of Civil Engineers, <br />London, U.K. <br />TRAINING & <br />CERTIFICATIONS <br />OSHA 10-hour. Construction <br />Course <br />Transportation Worker <br />Identification Credential <br />(TWIC) <br />FHWA – NHI Underwater <br />Bridge Inspection <br />PROFESSIONAL <br />AFFILIATIONS <br />American Society of Civil <br />Engineers <br />Boston Society of Civil <br />Engineers <br />GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 114