My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GEI Consultants, Inc. Bid Document (11)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
GEI Consultants, Inc
>
GEI Consultants, Inc. Bid Document (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:25:17 PM
Creation date
8/31/2026 1:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 58 <br />Arverne Nature Preserve Design and Dune Restoration <br />Far Rockaway, New York | NV5 (formerly RBA Group) <br />GEI designed a 35-acre nature preserve in the Rockaways on the southern tip <br />of Queens, New York. <br />The Far Rockaway community was devastated in 2012 during Hurricane Sandy and has been <br />slowly rebuilding and incorporating improved coastal resiliency measures. GEI was retained <br />by The RBA Group (now NV5) to provide specialized ecological restoration and landscape <br />architectural services related to endangered and threatened species protection, dune <br />restoration, and boardwalk reconstruction design for New York City Economic Development <br />Corporation and New York City Department of Parks and Recreation (NYCDPR). <br />The Arverne Central Park Preserve was designed to provide educational outreach for the public <br />with its Nature Center and 1.5-mile Loop Trail. The park also maintains an important wildlife <br />corridor, enhances native maritime communities (including rare Maritime Grassland), and <br />supplements the protective natural buff er for nesting shorebirds such as the endangered piping <br />plover and least terns. <br />GEI assisted with development of the concept design and agency approval process through <br />NYC Department of Housing Preservation and Development (HPD), NYCDPR, and the NYC Arts <br />Commission. GEI prepared the landscape restoration drawings and technical specifications, with <br />special consideration for protection of critical nesting habitats for endangered and threatened <br />birds, rare plants, and on-site sensitive areas within the coastal erosion hazard zone. The project <br />included an intensive invasive species management program designed to restore the natural <br />diversity of five distinct maritime communities. <br />GEI also provided construction support services to the design team through the review of sand <br />submittals and shop drawing reviews while project construction was underway. The project was <br />constructed in five phases and completed in 2017. <br />DATES <br />2014-2017 <br />Project initiated in 2014, <br />with construction planned in <br />five phases and targeted for <br />completion in 2017 (3-year <br />duration) <br />All phases were completed in <br />2017, on schedule <br />FEES <br />Original Budget: $40,000 <br />(final design fee for GEI’s <br />services) <br />Actual Budget: $40,000 <br />(delivered within the original <br />contract value) <br />CLIENT REFERENCE <br />DOMENICA STAZIAK <br />Senior Project Manager <br />(646) 253-8566 <br />KEY ELEMENTS <br />• Sustainable shoreline <br />design <br />• Public waterfront access <br />• Habitat restoration and <br />enhancement design <br />• Endangered & threatened <br />species investigation & <br />protection plan <br />• Coordination with multi- <br />City and State agencies <br />• Community outdoor <br />education facility
The URL can be used to link to this page
Your browser does not support the video tag.