My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GEI Consultants, Inc. Bid Document (11)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
GEI Consultants, Inc
>
GEI Consultants, Inc. Bid Document (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:25:17 PM
Creation date
8/31/2026 1:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 61 <br />Chelsea Piers: Piers 59, 60, and 61 <br />New York, NY | Chelsea Piers Management <br />The Chelsea Piers Sports & Entertainment Complex is a 28-acre waterfront <br />sports village located between 17th and 23rd Streets along the Hudson <br />River in Manhattan. Situated on Piers 59, 60, and 61, the Complex supports <br />a variety of sports, dining, and professional facilities and serves as a major <br />resource for public recreation and waterfront access. <br />Understanding the historical nature of the piers’ construction, Chelsea Piers has retained <br />the services of GEI’s waterfront engineers to furnish a suite of consulting services as part of a <br />comprehensive maintenance plan for the facility’s waterfront assets. Working collaboratively <br />with Chelsea Pier’s team of contractors, engineers, and facility managers, the GEI team’s primary <br />services for this client have included underwater inspections of submerged components— <br />including over 12,000 timber pile locations—and reviewing recently installed construction and <br />repairs for quality control and adherence to design specifications. <br />In addition, GEI staff developed a customized database application that tracks the historical <br />conditions and repair status of each pile element supporting piers 59, 60, and 61. This <br />database exports to Google Earth to graphically depict everything from condition grades to <br />construction progress. <br />Key challenges have included: <br />• Comprehensive underwater inspection of over 12,000 pile elements to determine current <br />levels of deterioration in comparison to historic findings of previous inspection eff orts <br />• Flexible scheduling of underwater inspections on an on-call basis to review construction <br />activities and meet critical project milestones <br />• Coordination among multiple contractor, engineer, and management entities <br />DATES <br />2016-Ongoing <br />CLIENT REFERENCE <br />MICHAEL BRAITO <br />Senior Vice President, <br />Chelsea Piers <br />braitm@chelseapiers.com <br />KEY ELEMENTS <br />• Underwater Inspection <br />• Construction Support <br />• Waterfront Facility <br />Management <br />• Database Management
The URL can be used to link to this page
Your browser does not support the video tag.