My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GEI Consultants, Inc. Bid Document (11)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
GEI Consultants, Inc
>
GEI Consultants, Inc. Bid Document (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:25:17 PM
Creation date
8/31/2026 1:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEI Consultants | City of Sunny Isles Beach | RFQ 26-07-01 63 <br />Living Shorelines Pilot Project <br />Brunswick and Yarmouth, Maine | Maine Department of Marine Resources <br />GEI worked as the lead engineering consultant for the Living Shorelines Pilot <br />Project undertaken collaboratively by the State of Maine Department of <br />Marine Resources, Maine Geological Survey, Casco Bay Estuary Partnership, <br />and other partner agencies as part of a regional Living Shoreline initiative <br />funded by the National Oceanic and Atmospheric Association (NOAA). <br />The project involved design, regulatory assistance, construction oversight, and long-term <br />monitoring of Living Shoreline installations at three sites on Casco Bay: <br />• An eroding marsh located on property owned by the Maine DIF&W in the Town of Brunswick. <br />The property is on upper Maquoit Bay adjacent to the Wharton Point Boat Launch. <br />• An eroding marsh located on the Maquoit Bay Conservation Lands property that is jointly <br />owned by the Town of Brunswick and Brunswick-Topsham Land Trust. The property is on <br />western Maquoit Bay. <br />• A highly unstable coastal bluff located on Lane’s Island, an undeveloped, conserved island <br />in the Town of Yarmouth near the mouth of the Royal River that is owned by Maine Coast <br />Heritage Trust. <br />GEI worked closely with the project partners to develop Living Shoreline treatment designs <br />aimed at identifying low-cost solutions to shoreline erosion that beneficially reuse onsite <br />and/or natural materials such as downed logs, bagged oyster shells, and native plantings, in <br />combination with biodegradable (coconut fiber) bagging material or synthetic baskets. <br />Construction of the three sites were completed in 2020, followed by a three-year monitoring <br />program to monitor the eff icacy of the diff erent installations in curtailing erosion; assess <br />the impacts of the treatments on surrounding habitats and survivability of the installations <br />in Maine’s harsh winter climate; and compare and contrast synthetic vs. biodegradable <br />installations at Wharton Point and Maquoit Bay Conservation Lands. <br />DATES <br />Design, Permitting, and <br />Construction 2019-2020 <br />Monitoring Program <br />2020-2022 <br />Construction and monitoring <br />were completed as planned <br />by 2022 <br />FEES <br />Original Budget: <br />$83,000 (GEI fee) <br />Actual Budget: $83,000 <br />(delivered within original <br />contract value) <br />CLIENT REFERENCE <br />KATHLEEN LEYDEN <br />Director, Maine Coastal <br />Program 207.287.3144 <br />kathleen.leyden@maine.gov <br />Maine Department of Marine <br />Resources <br />State House Station 21 <br />Augusta, ME 04333 <br />KEY ELEMENTS <br />• Site Assessment <br />• Living Shoreline Design <br />• Regulatory Assistance <br />• Construction Oversight
The URL can be used to link to this page
Your browser does not support the video tag.