Laserfiche WebLink
<br /> <br />Pedro Ugas <br />MIA Stormwater Model Update & Drainage Master Plan Support <br />Client: CDM Smith, Dates of Service: Jun–Aug 2023. Role: Survey Manager. Pedro was responsible for planning, coordinating, and <br />overseeing all Subsurface Utility Engineering (SUE) investigations, including utility designation, test hole operations, util ity conflict <br />analysis, and quality control. Pedro ensured all utility data is collected, verified, and delivered in accordance with ASCE 38 standards, <br />project requirements, and schedule commitments while serving as the primary point of coordination between the survey, <br />engineering, and utility stakeholders. <br />Client: Miami-Dade Aviation Department (MDAD). Sub to CDM SMITH, Jonathan Z. Goldman, PE. Ph: (954) 776 -1731, email: <br />goldmanjz@cdmsmith.com <br />FPID No. 443594-1-52-01, FPID No. 443867-1-52-01 and FPID No. 443595-1-52-01 Bridge Rehabilitation Project Client: FDOT <br />District Four, Broward and St. Lucie County. Duration: 2019 – Present. Role: Survey Manager. HADONNE performed 3D-Survey, <br />Underground Utility Investigation (SUE) and Utility Coordination for the rehabilitation of three bridges listed below. <br />• US-1 over Dania Cutoff Canal in Broward County, FPID No. 443594-1-52-01 <br />• A-1-A over Loxahatchee in Palm Beach County, FPID No. 443867-1-52-01 <br />• Port St. Lucie Blvd. over Long Creek in St. Lucie County, FPID No. 443595 -1-52-01 <br />Pedro was responsible for planning, coordinating, and overseeing all Subsurface Utility Engineering (SUE) investigations, including <br />utility designation, test hole operations, utility conflict analysis, and quality control. Pedro ensured all utility data is collected, <br />verified, and delivered in accordance with ASCE 38 standards, project requirements, and schedule commitments while serving as the <br />primary point of coordination between the survey, engineering, and utility stakeholders. supported the team in the preparation of <br />final files, and perming the final QC for the 3D and 2D portions of the scope. <br />Client: Florida Department of Transportation-District 4. Contact : Thuc H. Le, P.E., (954) 777-4552; thuc.le@dot.state.fl.us. <br />Districtwide Miscellaneous Design Safety / Push Bottom Contract. Miami-Dade County, Florida. Duration from March 2019 to <br />2024). Role: Survey Manager. Pedro was responsible for planning, coordinating, and overseeing all Subsurface Utility Engineering <br />(SUE) investigations, including utility designation, test hole operations, utility conflict analysis, and quality control. Pedro ensured all <br />utility data is collected, verified, and delivered in accordance with ASCE 38 standards, project requirements, and schedule <br />commitments while serving as the primary point of coordination between the survey, engineering, and utility stakeholders. Mr. <br />HADONNE provided SUE serviced for up to eight (8) Task Work Order totaling 30 subsurface scans and 65 utility test holes (VVHs). <br />Work included field scanning/locates, deliverable of Cad file and Test Holes Report. <br />Client: Florida Department of Transportation, District Six. Contact: Sub to Choice Engineering, Rafael Aguilar, PE, (305)-503-9873; <br />rsaguilar@choiceeng.com <br />Districtwide CAP47 FPID 480061-1-32-01 Traffic Ops / Push Bottom Contract. Miami-Dade County & Monroe County, Florida.. <br />Duration from March 2024 to Present). Role: Survey Manager. Pedro was responsible for planning, coordinating, and overseeing all <br />Subsurface Utility Engineering (SUE) investigations, including utility designation, test hole operations, utility conflict an alysis, and <br />quality control. Pedro ensured all utility data is collected, verified, and delivered in accordance with ASCE 38 standards, project <br />requirements, and schedule commitments while serving as the primary point of coordination between the survey, engineering, an d <br />utility stakeholders. HADONEE provided SUE services for up to fifteen (15) Task Work Order totaling (23) subsurface scans and (59) <br />utility test holes (VVHs) using GPR and vacuum excavating. Work included field scanning/locates, deliverable of Cad file and Test <br />Holes Report. Client: Florida Department of Transportation, District Six. Contact: Sub to Choice Engineering, Rafael Aguilar, PE, (305)- <br />503-9873; rsaguilar@choiceeng.com <br />Districtwide C-AB13 FM 250605-4-32-01 Miscellaneous PE Design Contract. Miami-Dade County, Florida Duration from January <br />2020 to 2025). Role: Survey Manager. Pedro was responsible for planning, coordinating, and overseeing all Subsurface Utility <br />Engineering (SUE) investigations, including utility designation, test hole operations, utility conflict analysis, and quality control. Pedro <br />ensured all utility data is collected, verified, and delivered in accordance with ASCE 38 standards, project requirements, and schedule <br />commitments while serving as the primary point of coordination between the survey, engineering, and utility stakeholders. HADONEE <br />provided SUE services for up to eight (8) Task Work Order totaling (5) subsurface scans and (73) utility test holes (VVHs) using GPR and <br />vacuum excavating. Work included field scanning/locates, deliverable of Cad file and Test Holes Report. Client: Florida Depa rtment <br />of Transportation, District Six. Contact: Sub to Alvarez Engineers, Raul Alessandri, PE, (305) 640-1345; <br />email: Raul.Alessandri@AlvarezEng.com <br />Districtwide C-A192 FM 439712-1-32-03 Miscellaneous PE Design Contract. Miami-Dade County, Florida Duration from January <br />2019 to 2023). Role: Survey Manager. Pedro was responsible for planning, coordinating, and overseeing all Subsurface Utility <br />Engineering (SUE) investigations, including utility designation, test hole operations, utility conflict analysis, and quality control. Pedro <br />ensured all utility data is collected, verified, and delivered in accordance with ASCE 38 standards, project requirements, and schedule <br />commitments while serving as the primary point of coordination between the survey, engineering, and utility stakeholders. HADONEE <br />provided SUE services to twelve (12) Task Work Order totaling (2) subsurface scans and (185) utility test holes (VVHs) using GPR and <br />vacuum excavating. Work included field scanning/locates, deliverable of Cad file and Test Holes Report. Client: Florida Depa rtment <br />of Transportation, District Six. Contact: Sub to Choice Engineering, Rafael Aguilar, PE, (305)-503-9873; rsaguilar@choiceeng.com <br /> <br /> <br />33