My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />Schedule of Proposed Services <br />Kimley-Horn is prepared to provide the City of Sunny Isles Beach with the full range of professional architectural and <br />engineering services required under this continuing contract. Our multidisciplinary team performs the vast majority <br />of anticipated task orders in-house, allowing the City to mobilize qualified staff quickly and maintain a single point of <br />accountability across the following disciplines: <br /> ĥ General Civil Engineering <br /> ĥ Landscape Architecture <br /> ĥ Transportation/Transit/Traffic Engineering <br /> ĥ Environmental/Coastal Engineering <br /> ĥ Surveying and Mapping <br /> ĥ Structural Engineering <br /> ĥ Mechanical, HVAC, and Plumbing (MEP) Engineering <br /> ĥ Electrical Engineering <br /> ĥ Professional Grant Writing <br /> ĥ Geotechnical Engineering (via subconsultant) <br />Because each contract is awarded on a qualifications basis by discipline, the team above is structured so that <br />Kimley-Horn can respond to task orders in every category the City anticipates issuing. For any specialized assignment <br />that falls outside routine needs, we can draw on the broader resources of Kimley-Horn’s Tri-County offices without <br />adding delay. <br />Kimley-Horn understands that each task order issued under this continuing architectural and engineering services <br />contract will carry its own scope, complexity, and timeline. The schedule below reflects our approach to a representative <br />task order and demonstrates our understanding of the key phases, issues, and tasks involved in delivering professional <br />services under this contract. Critically, it reflects a core principle we apply to every project in South Florida: permitting <br />activities must begin at the earliest possible stage, not after design is complete. <br />UNDERSTANDING OF KEY ISSUES <br />South Florida’s regulatory landscape is among the most complex in the nation. Projects in Miami-Dade County routinely <br />require coordination with multiple agencies simultaneously, including FDEP, DERM, USACE, SFWMD, FDOT, and <br />local building and zoning departments. Permitting timelines are frequently on the critical path and can extend project <br />schedules if not initiated early. <br />Our team addresses this reality by integrating permitting strategy into the scoping phase of every project. We identify <br />applicable regulatory triggers, develop a permitting pathway, and initiate pre-application meetings with agencies before <br />design is finalized. This approach keeps projects moving and reduces the risk of late-stage surprises. <br />KEY SCHEDULE NOTES <br />PERMITTING IS ON THE CRITICAL PATH. In South Florida, agency review periods for FDEP, DERM, SFWMD, <br />and USACE permits can range from 30 days to six months or more depending on project complexity, environmental <br />sensitivity, and agency workload. Kimley-Horn initiates permitting activities concurrently with preliminary engineering, <br />not after design is complete. Pre-application meetings are scheduled early to align the design with agency expectations <br />before significant design investment is made. <br />SCOPING DRIVES EVERYTHING. The overall project schedule is determined during scoping. Our Project Manager <br />will meet with client staff at the outset of each task order to confirm scope, schedule, budget, key contacts, and client <br />preferences before work begins. This alignment prevents scope creep and avoids mid-project course corrections.
The URL can be used to link to this page
Your browser does not support the video tag.