My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />CIVIL ENGINEERING: <br />Village of Key Biscayne Continuing A/E <br />Services Contract, <br />Key Biscayne, FL <br />Kimley-Horn serves as an on-call professional services consultant to the Village <br />of Key Biscayne, providing multidisciplinary planning, engineering, architectural, <br />and project management support on an as-needed basis. Through this continuing <br />services contract, our team assists the Village with a wide range of capital <br />improvement projects, including planning, design, permitting, bidding assistance, <br />construction administration, and stakeholder coordination. <br />North Beach Undergrounding, Hollywood, FL <br />The City of Hollywood chose to convert the aerial electric, communication, <br />and cable lines in this coastal community from overhead to an underground <br />location. Kimley-Horn serves as prime consultant who designed and <br />permitted the underground conversion process in close coordination with <br />FPL, AT&T, and Comcast. Kimley-Horn performed the detailed design for <br />this coastal neighborhood project consisting of nine streets on the north <br />end of Hollywood Beach. Kimley-Horn designed the conduit and pull box <br />infrastructure for the electric (FPL) and communications (AT&T and Comcast) <br />utilities along with providing easement acquisition assistance, utility provider <br />coordination, street lighting design, FDOT and FDEP CCCL permitting, and <br />infrastructure upgrade design services. Since this project is located on one <br />of Florida’s coastal communities, sea turtles were considered in the street <br />lighting design. Kimley-Horn supported the City of Hollywood Beach by <br />preparing presentation materials, attending, and presenting or participating in <br />public meetings regarding the project. Bid and construction phase services <br />were also provided for the project. <br />On-CallDates of Service: <br />2021–Ongoing <br />Contact: <br /> H Christopher Miranda <br /> Ǚ Village of Key Biscayne <br />Public Works Director <br /> Ȋ 88 W McIntyre St, Key <br />Biscayne, FL 33149 <br /> °305.365.7568 ext.1256 <br />Dates of Service: <br />2021–Ongoing (Design Phase <br />Professional Services were <br />initiated 2021; Construction Phase <br />Professional Services were initiated in <br />2023; construction is ongoing) <br />Contact: <br /> H Luis Lopez, PE <br /> Ǚ Engineering Support Services <br />Manager/ Engineering Design and <br />Construction Management <br /> Ȋ 2600 Hollywood Boulevard <br />Hollywood, FL 33020-4807 <br /> °954.921.3925
The URL can be used to link to this page
Your browser does not support the video tag.