My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />Safe Routes to School Miami Southridge Senior High School - FPID 447599-1 <br />The scope of work included the installation of regulatory and warning signage in conjunction with high-emphasis <br />crosswalks to significantly enhance pedestrian visibility and safety. Construct well-defined crosswalks and equip them <br />with countdown pedestrian signal heads and accessible push-button activation devices. These improvements will <br />promote safer pedestrian crossings, improve driver awareness, and ensure compliance with accessibility and traffic <br />safety standards. <br />Dates of service: 2024–Ongoing <br />Model City Brownsville Bicycle Blvd - FPID 446748-1 <br />The Model City Brownsville Bicycle Boulevard Project along NW 21st Avenue from NW 41st Street to NW 79th Street <br />involved the design and implementation of multimodal corridor enhancements aimed at creating a safer and more <br />comfortable bicycling environment for neighborhood residents. The project included re-striping and re-signing the <br />full corridor, the addition of bicyclist-oriented wayfinding signage, and new pavement markings tailored to support <br />bicycle navigation and visibility. The improvements also incorporated select bulb-out modifications and other geometric <br />refinements to calm traffic and enhance safety at key locations. Extensive coordination with Miami-Dade County <br />DTPW, FDOT, and multiple utility agencies supported the development of construction-ready plans aligned with County <br />multimodal design criteria. These enhancements work collectively to promote bike-friendly mobility, increase corridor <br />safety, and improve the long-term operational performance of this important community connector. <br />Dates of service: 2024–Ongoing <br />N Miami Ave and N 195th St Traffic Circle - FPID 449371-1 <br />The Traffic Circle Improvements at the intersection of N Miami Avenue and N 195th Street for Miami-Dade County <br />DTPW involved the design and construction of a new traffic circle within the County’s public right-of-way, aimed at <br />enhancing safety and traffic operations throughout the surrounding area. The project included, but was not limited to, <br />drainage upgrades, proposed lighting, sidewalk reconstruction, enhanced pedestrian facilities, signing and pavement <br />markings, and extensive coordination with FDOT and multiple utility agencies. These improvements were developed to <br />meet County design criteria, modernize the intersection, improve vehicular flow, and incorporate necessary upgrades to <br />support long-term operational performance. <br />Dates of service: 2024–2025 <br />Contact: <br /> H Dalila Fernandez, PE <br /> H Jose Dacal, PE <br /> Ǚ Miami-Dade County <br />DTPW Traffic <br />Engineering Division <br />School Section Head <br /> Ǚ Miami-Dade County <br />Department of <br />Public Works <br /> Ȋ 111 NW 1st Street <br />Miami, FL 33128 <br /> Ȋ 111 NW 1st Street <br />Miami, FL 33128 <br /> °305.375.1684 <br /> °305.375.4346
The URL can be used to link to this page
Your browser does not support the video tag.