My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />RiversEdge, Jacksonville, FL <br />Kimley-Horn is currently providing design, permitting, <br />and construction phase services for more than 1,900 <br />linear feet of new seawall and bulkhead along the St. <br />Johns River. The new seawall and bulkhead are a <br />critical piece of new infrastructure for future <br />development of the RiversEdge site. The proposed <br />design had to address the replacement of an existing <br />seawall that is more than 65 years old and has a <br />variety of challenges, including significant <br />deterioration of existing sheet piles and the retention <br />of potentially contaminated soils. Kimley-Horn’s <br />in-house marine structural engineers have prepared plans for the permitting and construction of a new seawall and <br />bulkhead. Kimley-Horn utilized a variety of resources to help shape the proposed design. This approach included <br />evaluation of the findings from the resiliency study, retention of contaminated soils, construction costs, construction <br />methods, future riverwalk and park connections, and the future marina. Kimley-Horn successfully obtained permits from <br />FDEP, USACE, the City of Jacksonville, and the St. Johns River Water Management District (SJRWMD) ahead of <br />anticipated schedules. <br />Dates of Service: <br />2021–2024 (design complete; construction ongoing) <br />Contact: <br /> H Craig Wrathell <br /> Ǚ WHH Associates District Manager <br /> Ȋ 2300 Glades Rd, #410W, Boca Raton, FL 33431 <br /> °561.571.0010
The URL can be used to link to this page
Your browser does not support the video tag.