Laserfiche WebLink
36IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />Dunedin Master Plan, Seawall, and Fishing Pier Replacement, Dunedin, FL <br />Kimley-Horn was responsible for the structural evaluation of the existing bulkhead, fishing pier, 100+ marina slips— <br />including floating docks and wood finger piers—a boat ramp, and wood boardwalks in this major park upgrade. We <br />provided comprehensive marina planning, general marina design concept options, utility coordination and support, <br />permit guidance and boat ramp traffic flow concepts and options. <br />Kimley-Horn was selected to develop a comprehensive Master Plan for the Dunedin Marina and its associated public <br />facilities. This Master Plan was crafted based on valuable input gathered from community engagement meetings, <br />stakeholder consultations, and feedback from city staff and the City Commission. Kimley-Horn’s scope of services <br />encompasses project administration, coordination of meetings, data collection, public and stakeholder engagement, <br />marina site assessment, seawall and pier assessment, conceptual development of the master plan, including the upland <br />waterfront public park space, and the delivery of the final master plan document. Upon completion of the master plan and <br />after multiple storms, Kimley-Horn was selected to design the seawall and fishing pier replacement for the same site. <br />Dates of Service: <br />2024–Ongoing <br />Contact: <br /> H Clayton T. Watkins, PE <br /> Ǚ Director of Utilities and Engineering <br /> Ȋ 737 Louden Avenue, Dunedin, FL 34698 <br /> °727.298.3180