My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
42IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />STRUCTURAL ENGINEERING <br />Veterans Memorial Island Bridge Repairs and Replacement, <br />Vero Beach, FL <br />This project involves the replacement of the existing Veterans Memorial Island bridge <br />over the Rio Mar Bay within the Indian River Lagoon. The replacement bridge is <br />a 3-span prestressed concrete slab unit bridge that is designed to follow FDOT <br />design criteria for an extremely corrosive environment. The bridge utilizes stainless <br />steel reinforcing steel in the substructure to provide corrosion resistance in this <br />extremely aggressive environment. In addition to designing the bridge, Kimley-Horn <br />designed the utility relocations, approach roadway, and revetment. This bridge <br />was constructed in an environmentally sensitive area and required extensive <br />environmental permitting associated with the removal of mangroves as well as <br />oyster relocations. With this bridge being the only access to an island, the City <br />wanted the bridge replaced within a 4-month window. The bridge was designed with time-sensitive elements in mind and <br />investigated material availability. Kimley-Horn also assisted the City in the bidding and construction phases of the project. <br />Kimley-Horn hosted weekly progress meetings, coordinated material testing, inspected the progress of the work, reviewed <br />pay applications, conducted and coordinated the as-built load rating with FDOT, and managed project closeout. <br />Dates of Service: <br />2020–2022 <br />Contact: <br /> H Danessa Chambers, PE <br /> Ǚ City of Vero Beach Public <br />Works Department <br /> Ȋ 1053 20th Place, Vero <br />Beach, FL 32960 <br /> °772.978.4815
The URL can be used to link to this page
Your browser does not support the video tag.