Laserfiche WebLink
6IWFLFTLD016838.2026 <br />ROBERT SLOOP, PE (CA) <br />Environmental/Coastal Engineering <br />RELEVANT EXPERIENCE <br />CASTILLO DE SAN MARCOS SEAWALL REHABILITATION, NATIONAL <br />PARK SERVICE, ST. AUGUSTINE, FL* — Principal-in-Charge. Resiliency- <br />focused rehabilitation of approximately 1,400 linear feet of historic seawall <br />protecting the Castillo de San Marcos National Monument. Responsibilities <br />included coastal protection design, structural inspection, environmental <br />compliance, and permitting through USACE and FDEP. <br />SEBASTIAN RIVER MUCK REMOVAL AND INLET DREDGING, SEBASTIAN, <br />FL* — Project Engineer. Responsible for dredging and disposal design for the <br />removal of approximately two million cubic yards of muck from the Sebastian <br />River to improve water quality in the Indian River Lagoon. The project involved <br />extensive bathymetric surveying, geotechnical investigation, dredging design, <br />and regulatory permitting. <br />HURRICANE PASS NAVIGATION IMPROVEMENTS AND HONEYMOON <br />ISLAND BEACH RESTORATION, PINELLAS COUNTY, FL* — Project <br />Manager. Navigational improvements and beach restoration efforts involving <br />sediment transport analysis, shoreline change evaluation, dredging design, <br />permitting coordination, and development of construction documentation. <br />BAYSHORE AND MARJORIE PARK MARINA IMPROVEMENTS, TAMPA, <br />FL* — Project Manager. upgrades to two municipal marinas and associated <br />waterfront facilities. Work included repairs to existing docks and fender systems, <br />dredging, installation of floating docks, shoreline improvements, and associated <br />site infrastructure upgrades. <br />KEY WEST BIGHT HARBOR IMPROVEMENTS, KEY WEST, FL* — Project <br />Manager. Responsible for final design and construction support for upgrades to <br />harbor infrastructure including bulkhead reconstruction, boardwalk improvements, <br />and development of a 150-slip marina facility. Work included complex <br />environmental permitting and coordination with state regulatory agencies. <br />LOVER’S KEY STATE PARK BOAT RAMP AND MARINA IMPROVEMENTS, <br />FORT MYERS BEACH, FL* — Project Manager. Design and upgrades to state <br />park boating facilities including new boat ramps, floating docks, utilities, and <br />associated public waterfront access infrastructure. <br />HARBORPLACE WATERFRONT REDEVELOPMENT, BALTIMORE, <br />MD* — Principal-in-Charge. Waterfront design lead for redevelopment of <br />Baltimore’s Inner Harbor waterfront infrastructure. The project included seawall <br />reconstruction, bulkheads, floating docks, and marina facilities along with public <br />waterfront improvements. <br />*PROJECTS COMPLETED PRIOR TO JOINING KIMLEY-HORN <br />VALUE TO THE CITY OF <br />SUNNY ISLES BEACH <br /> ­More than 30 years of <br />experience leading waterfront <br />engineering, coastal resiliency, <br />shoreline stabilization, <br />and permitting projects <br /> ­Extensive experience <br />delivering planning, design, <br />and construction support <br />for seawalls, breakwaters, <br />marinas, dredging, waterfront <br />developments, and shoreline <br />restoration projects <br /> ­Proven experience <br />coordinating with USACE, <br />FDEP, water management <br />districts, and local <br />regulatory agencies <br />PROFESSIONAL <br />CREDENTIALS <br /> ­Master of Science, <br />Coastal Engineering, <br />University of Florida <br /> ­Bachelor of Science, <br />Mechanical Engineering, <br />University of South <br />Florida - USF Tampa <br /> ­Professional Engineer <br />in CA, #72878