Laserfiche WebLink
<br />Javier E. Jiménez, P.E. <br />Senior Materials Engineer/QA/QC Review <br />PROFESSIONAL EXPERIENCE <br />Javier is a registered (Florida) professional engineer with more than 25 years of <br />expertise in construction materials engineering, testing, and inspection services. He <br />brings extensive experience in project management, structural engineering design, <br />construction defect investigations, construction defect mitigation inspections, non- <br />destructive testing of building envelope and structural components, forensic <br />investigations, construction materials testing, and facilities engineering experience. <br /> <br />Javier is a senior associate and the Operations Manager for Terracon’s Fort Lauderdale <br />and Miami offices and laboratories. Javier serves as the senior materials engineer with <br />direct technical responsibility for field inspection and construction materials testing, <br />including laboratory testing services. He is responsible for evaluating and overseeing <br />the construction of earthworks (embankments, levees, slopes), roadways and bridges; <br />soil improvement/ replacement. On a day-to-day basis, he provides technical oversight <br />and direction to engineering and technical staff, prepares study scope and fee proposal <br />documents; report preparation; and is responsible for contract conformance (quality <br />assurance/quality control [QA/QC]). Javier oversees and directs the construction <br />services group, prepares proposals, conducts evaluations, provides field <br />troubleshooting, and prepares project reports and invoices. His duties also include <br />overseeing and maintaining quality control programs. <br /> <br />PROJECT EXPERIENCE <br />State Road (SR) 25/Okeechobee Road from East of NW 107 Avenue to East of NW <br />116 Way – Miami-Dade County, FL <br />Construction Services Manager/Senior Materials Engineer. This FDOT project consists <br />of building a grade separation (bridge) on SR 25/Okeechobee Road over NW 87 <br />Avenue, building flyover ramps to and from SR 25/Okeechobee Road and NW 87 <br />Avenue, reconstructing NW 87 Avenue from south of SR 25/ Okeechobee Road to north <br />of NW 103 Street Realigning NW 103 Street, sidewalk construction, reconstructing NW <br />South River Drive, removing the existing bridge at NW 105 Way and building a new low- <br />level bridge at NW 106 Street, widening of NW 106 Street, and construction of Control <br />Structure G-72E. Terracon is responsible for performing QC testing and inspection <br />services for the general contractor. CTQP-certified technicians perform field sampling <br />and testing, and Terracon conducts laboratory services for soils and concrete on this <br />project. The firm’s QC Manager or his representative supervises and schedules Terracon <br />personnel, reviews density log book entries made by Terracon, logs samples into the <br />MAC reporting system, ensures construction compliance with the specifications and <br />plans documents and prepares monthly invoices and quantities for the job guide <br />schedule. <br /> <br />Miami Midtown IV – Miami, FL <br />Construction Services Manager. The project consisted of the construction of a 31-story <br />mixed-use structure with a total approximate area of 499,744 square feet as well as a <br />40-story mixed-use facility that includes mercantile, hotel, condominiums and parking <br />garage with a total approximate area of 760,229 square feet. Mr Jimenez managed the <br />team that provided Construction Materials Testing and Threshold Inspection Services. <br /> <br />EDUCATION <br />Master of Business <br />Administration, Nova <br />Southeastern University, Davie, <br />FL <br /> <br />Master of Science in Civil <br />Engineering, University of <br />Michigan, Ann Arbor, MI <br /> <br />Bachelor of Civil Engineering, <br />Georgia Institute of <br />Technology, Atlanta, GA <br /> <br />REGISTRATIONS <br />Registered Professional <br />Engineer: Florida No. 62162 <br /> <br />Registered Professional <br />Engineer <br />Puerto Rico No. 16347 <br /> <br />CERTIFICATIONS <br />LEED AP <br /> <br />AFFILIATIONS <br />American Society of Civil <br />Engineers <br />American Welding Society <br />Latin Builders Association <br /> <br />YEARS OF EXPERIENCE <br />With Terracon: 4 <br />Total in Industry: 28 <br /> <br />OFFICE LOCATION <br />Miami, FL and <br />Fort Lauderdale, FL <br />