My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. Bid Document (9)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Kimley-Horn and Associates, Inc
>
Kimley-Horn and Associates, Inc. Bid Document (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:28:28 PM
Creation date
8/31/2026 1:26:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
75IWFLFTLD016838.2026 <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL <br />Upon receiving a concern, Cesar will confirm his understanding of the issue with the City, identify the root cause, and <br />coordinate with the appropriate TWO Project Manager or Discipline Leader to establish a corrective action and clear <br />timeline for resolution. The City’s Project Manager will remain informed throughout the process, and Cesar will follow <br />through to confirm that the issue has been fully addressed and that the resolution meets the City’s expectations. For <br />Kimley-Horn, resolving an issue is not simply about correcting the immediate concern, it is also about <br />understanding why it occurred and applying lessons learned to prevent it from recurring. <br />Kimley-Horn’s depth of local and regional resources further supports this commitment. When additional expertise or <br />production support is needed, we can quickly supplement or adjust the project team to resolve the issue while <br />maintaining progress on other active TWOs. Our goal is to address concerns promptly, professionally, and transparently <br />while preserving the strong working relationship and trust that are essential to a successful long-term on-call contract. <br />Cost Control <br />COST ESTIMATE DEVELOPMENT AND UPDATES. For each TWO, Cesar and the assigned Discipline Lead <br />will prepare a detailed fee estimate and, for design and construction assignments, an Opinion of Probable Construction <br />Cost (OPCC). Our estimates will be developed using current unit pricing, recent bid tabulations from comparable South <br />Florida municipal projects, and input from our construction-phase staff. An initial OPCC will be prepared during the <br />conceptual or scoping phase and updated at each major design milestone, typically at the 30%, 60%, 90%, and final <br />submittals. This progressive estimating approach gives the City a current and defensible understanding of anticipated <br />construction costs as the design advances. During construction, we will monitor the approved contract value against <br />pay applications, potential change orders, and other cost impacts, and promptly communicate any material variance to <br />the City’s Project Manager. <br />DEGREE OF ACCURACY. Because our estimates are based on current market information and are refined as design <br />details become more defined, our final engineer’s estimates have consistently tracked within approximately 5 to 10 <br />percent of reasonable low bids on comparable roadway, drainage, and streetscape projects. This level of accuracy <br />gives municipal clients greater confidence in project affordability before proceeding to bid and allows potential budget <br />concerns to be addressed while there is still flexibility in the design. <br />VALUE ENGINEERING. Value engineering is incorporated throughout our design process rather than treated as a <br />separate exercise late in project development. Our goal is to identify opportunities to reduce cost, simplify construction, <br />and improve long-term performance without compromising quality, functionality, or the City’s design objectives. On <br />comparable stormwater and roadway improvement projects, our team has maintained project budgets by optimizing <br />drainage layouts to take advantage of existing system capacity, refining pavement sections based on actual subgrade <br />conditions, and developing construction phasing that reduces maintenance-of-traffic impacts and costs. These types of <br />practical design decisions help preserve project intent while providing the City with better overall value. <br />CONSTRUCTABILITY. Constructability will be evaluated throughout design with a focus on identifying conditions that <br />could increase construction cost or create unnecessary change orders. Our TWO Project Managers, Discipline Leaders, <br />and construction-phase staff will review utility conflicts, access, construction sequencing, maintenance of traffic, <br />temporary conditions, material availability, and other factors that can significantly affect the OPCC and final bid price. <br />Identifying these issues early allows the team to incorporate practical, cost-effective solutions while there is still flexibility <br />in the design.
The URL can be used to link to this page
Your browser does not support the video tag.