Laserfiche WebLink
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190 <br />| Page 39 Staffing - Landscape ArchitectureSection 3 <br />City of Miami Beach Chase Avenue and 34th Street <br />Shared Path - Provided surveying, civil engineering and <br />landscape architecture services related to the new 10-foot <br />shared use path which supports the use of simultaneous <br />pedestrian and bicycle activity. The scope of services <br />included topographic surveying, tree inventory, disposition <br />and permitting; irrigation, landscape, hardscape and <br />amenities design, site civil design development, permitting <br />coordination, bidding assistance/contract administration and <br />construction phase tasks including construction observation. <br />Greater Boca Raton Beach and Parks District North <br />Park Hills and Trails Design Services - Providing <br />surveying, environmental, geotechnical, architectural, civil <br />engineering, landscape architecture, lighting and permitting <br />assistance services for the Site Plan Preparation, Design and <br />Permitting of Phases 1 and 2 of the Northeast (Hills) and <br />Southeast (Trails) quadrants of the proposed North Park. <br />Town of Davie Parks and Recreation Master Plan <br />(PRMP) - Miller Legg is preparing the Town of Davie’s <br />first Parks and Recreation Master Plan. The Master Plan <br />is a tool intended to help the Town of Davie meet the <br />current and future recreational and cultural needs of this <br />unique 35-square-mile community of 107,000 residents in <br />central Broward County. The resident-driven plan serves <br />as a source of applicable decision-making information <br />and establishes clear goals and actionable objectives to <br />guide staff, advisory committees, and Town Council in <br />their work to maintain and enhance Davie’s system of 32 <br />parks, recreation and cultural facilities, including 165 miles <br />of trail system. Public workshops and public online survey <br />will assist in determining community recreation needs and <br />desires. All parks and facilities will be reviewed, along with <br />future expansion opportunities to accommodate program <br />requirements over the next 10 years. In addition, Miller Legg <br />will assist with the Town’s CAPRA accreditation. <br />City of Coconut Creek Oak Trails Park Improvements <br />- For this project under the firm’s Continuing Services <br />Contract, Miller Legg is providing landscape architecture, <br />planning, civil engineering, surveying and environmental <br />services from initial design through construction. The purpose <br />of this scope is to expand the existing five-acre passive park <br />by incorporating two additional five-acre parcels, creating a <br />10-acre expansion area. The project includes renovating an <br />existing ±1,000 SF residential building into a nature center <br />with classroom and restroom facilities. The project will <br />pursue LEED certification while maintaining a $2.5 million <br />budget, supported in part by Florida Communities Trust <br />(FCT) grant funding. Proposed park amenities include water <br />fountains, a multi-use trail, outdoor fitness equipment, <br />picnic tables, a multi-purpose field, a butterfly garden, and <br />one acre of native vegetation. <br />for the alignment of the Western Extension of the existing <br />Biscayne Everglades Greenway Trail (BEGT). The Study Area <br />is from the C-103 Canal Crossing at East Mowry Drive to the <br />192nd Avenue intersection with West Mowry Drive. Miller <br />Legg’s scope comprises compilation of an existing conditions <br />inventory, preparation of a matrix of criteria to use in the <br />evaluation of the potential trail alignments, preparation of <br />various preliminary alignment alternatives with Opinions <br />of Probable Cost, development of a preferred alignment <br />with location, typical design, proposed enhancements, right <br />of way/property issues associated with implementation, <br />potential property acquisitions, followed by creation of the <br />Feasibility Report for presentation to the City Council. The <br />Study was funded by an FDOT SUN Trail Grant. <br />City of Fort Lauderdale Las Olas Streetscape Design <br />- Designed each of the four districts to retain its individual <br />identity, while simultaneously being part of a cohesive <br />complete street design between Downtown Fort Lauderdale <br />and The Beach. Responsible for planting design, placemaking <br />and programming services, overhead shade structures, <br />programming the pedestrian districts along the corridor <br />which integrated hardscape design, seating design, and open <br />space utilization, as well as multiple public outreach efforts <br />including conceptual graphics and renderings to support <br />meetings with homeowner association groups. <br />City of Hallandale Beach Atlantic Shores Boulevard <br />from US-1 / Federal Highway to Diplomat Parkway <br />- This 1/4-mile milling and resurfacing project included <br />enhancements along Atlantic Shores Boulevard between US <br />1 and Diplomat Parkway. Enhancements included drainage, <br />signage and pavement markings, signalization, lighting, <br />landscaping and hardscape. Specific landscape architecture <br />analysis and design services included landscape architecture <br />and irrigation plans for the median islands, swales, parking <br />islands/bulbouts, hardscape and a roundabout. <br />City of Tamarac D/B Caporella Park Overflow Parking <br />Lot - For the design/build Caporella Park improvement <br />project, Miller Legg is providing landscape architecture <br />and arborist services, civil engineering, permitting, and <br />construction administration services for the overflow <br />parking lot. Services include landscape architecture and <br />irrigation design, tree removal, tree relocation and tree <br />permitting. Other services include pre-design meetings, <br />design review meetings, site investigation visits as well as <br />coordination with other disciplines. Park amenities include <br />an amphitheater, a picnic shelter, 4,000 SF playground, multi- <br />purpose court, boat launch dock, fishing pier, splash pad, <br />and shaded fitness station. Miller Legg is a subconsultant to <br />Waypoint Contracting. <br />Michael Bradley, RLA