Laserfiche WebLink
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190 <br />| Page 53 Staffing - Surveying / MappingSection 3 <br />Legg’s scope comprises compilation of an existing conditions <br />inventory, preparation of a matrix of criteria to use in the <br />evaluation of the potential trail alignments, preparation of <br />various preliminary alignment alternatives with Opinions of <br />Probable Cost, development of a preferred alignment with <br />location, typical design, proposed enhancements, right of way/ <br />property issues associated with implementation, potential <br />property acquisitions, followed by creation of the Feasibility <br />Report for presentation to the City Council. The Study was <br />funded by an FDOT SUN Trail Grant. <br />City of Miami Armbrister Park Community Center - <br />Esther Mae Armbrister Park is a 4.4-acre City of Miami Park <br />with amenities that included an existing community center, <br />baseball and football fields, tennis and basketball courts, <br />playground and exercise equipment. The project involved <br />replacement of the existing community center building with <br />a new 10,000 SF 2-story facility and outdoor pavilion. Miller <br />Legg was responsible for civil, landscape architecture and SUE <br />services along with boundary, topographic and tree surveying. <br />The firm provided site civil and utility infrastructure research <br />of utility maps, as-builts and existing site conditions followed <br />by preparation of civil, landscape architecture and irrigation <br />construction documents, government agency permitting <br />coordination, bidding assistance, contract administration and <br />construction administration. Tree inventory, disposition plans <br />and permitting are part of the scope provided by the firm’s <br />certified arborists. <br />City of Homestead Biscayne-Everglades Greenway Trail <br />- Among the services Miller Legg provided for this 3.2 mile, <br />12-foot-wide Biscayne Everglades Greenway shared-use trail <br />project are landscape architectural, engineering, surveying <br />and environmental services including preparation of FDOT- <br />approved construction documents, design of regulatory and <br />wayfinding signs, pavement markings, safe pedestrian push <br />button crossing and necessary drainage within the C-103 <br />Canal right-of-way from East Mowry Drive to SW 137th <br />Avenue in Homestead. The scope of services was based upon <br />a 2017 Florida Shared-use Non-Motorized Trail Agreement <br />between the City of Homestead and FDOT. Topographic <br />and SUE services were delivered. The scope included <br />engineering design and permitting services for the shared-use <br />Professional Experience: <br />Sandro has almost 30 years of professional surveying <br />experience ranging from a field crew chief to survey manager <br />overseeing survey crews. His areas of expertise include land <br />surveying, boundary, topographic, ALTA, control surveys, <br />utility surveys, 3D Radar Tomography, GPS, route surveys, <br />legal descriptions, laser scanning, and construction layout <br />calculations. He is experienced in AutoCAD, Civil 3D, <br />Cyclone and CloudWorx, and Trimble Geomatics Office. <br />Prior to joining Miller Legg, Sandro was Survey Coordinator <br />Manager with another South Florida surveying firm for 15 <br />years. <br />Relevant Project Experience: <br />City of Miami E.G. Sewell Park - Under contract with <br />the City for program development, pre-design, master <br />planning design, public involvement workshops, construction <br />documents and construction administration services. <br />The scope of services includes landscape architecture, <br />environmental, civil engineering, topographical surveying, <br />SUE, arborist, structural engineering, electrical engineering, <br />geotechnical engineering, archeological, permitting, bidding <br />assistance and limited construction administration. <br />City of Miami Fairlawn Community Park - Under our <br />continuing services contract, provided programming, pre- <br />design, construction documents, and construction phase <br />services for a new 1-acre Community Park on SW 63rd <br />Avenue. Scope included planning, civil, structural, electrical, <br />geotechnical engineering, landscape architecture, surveying, <br />permitting, and cost estimating. <br />City of Homestead Biscayne Everglades Trail Western <br />Expansion Feasibility Study - Miller Legg was retained to <br />conduct a feasibility study to assist the City of Homestead <br />in determining the preferred 3-mile route and trail design <br />for the alignment of the Western Extension of the existing <br />Biscayne Everglades Greenway Trail (BEGT). The Study Area <br />is from the C-103 Canal Crossing at East Mowry Drive to the <br />192nd Avenue intersection with West Mowry Drive. Miller <br />Years of Experience: 29 <br />Registrations & Certifications: <br />Certified Survey Technician, FL, 2021 <br />Remote Pilot Certification, FL, 2020 <br />Education: <br />Civil Engineering (2 of 5 yrs completed for <br />Bachelor’s) <br />National Autonomous University of Honduras, 1997 <br />Associate of Science, Drafting/CAD <br />ATI Career Training Center, 2002 <br />Sandro Elvir, CST I <br />Project Manager | selvir@millerlegg.com | 954-628-3666