|
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190
<br />| Page 54 Staffing - Surveying / MappingSection 3
<br />invertebrate identification, seagrass survey, mitigation credit
<br />determination, and USACE dredge and fill permitting. The
<br />seagrass survey was conducted using scuba diving and digital
<br />global positioning satellite equipment and included transect/
<br />quadrant measurements of seagrass density, abundance, and
<br />frequency of occurrence.
<br />Everglades Holiday Park Arena - Providing survey,
<br />geotechnical, environmental, civil, mechanical, structural
<br />engineering, landscape architecture, permitting assistance
<br />and construction phase services for the proposed arena at
<br />Everglades Holiday Park.
<br />City of Fort Lauderdale Las Olas Streetscape Design
<br />- As a subconsultant to The Corradino Group, Miller Legg
<br />has provided various landscape architecture services for the
<br />Las Olas Streetscape Project. The project spans eastward
<br />from Andrews Avenue and engages four (4) distinct districts
<br />along Las Olas Boulevard including Downtown Las Olas, The
<br />Historic Shops, Colee Hammock, and The Isles. Each district
<br />has been designed to retain its individual identity, while
<br />simultaneously being part of a cohesive complete street
<br />design between Downtown Fort Lauderdale and The Beach.
<br />Miller Legg’s planting design along the corridor was entirely
<br />composed of native and Florida Friendly species to create a
<br />pedestrian friendly environment accenting each district along
<br />Las Olas Boulevard. Miller Legg also provided placemaking
<br />and programming services, for which the designers created
<br />parklets, plazas, and iconic hardscape elements with water
<br />features and public art installations that work as resting
<br />places and wayfinding spots. These systems incorporate
<br />such slogans as “Meet me at Las Olas” “Colee Hammock”
<br />and “The Isles” in the hardscape to promote wayfinding.
<br />Overhead shade structures were also designed to help with
<br />wayfinding through decorative elements subtly depicting the
<br />initials corresponding to each area (eg. “HSLO” for Historic
<br />Shops Las Olas). Miller Legg’s scope included programming
<br />the pedestrian areas along the corridor which integrated
<br />hardscape design, seating design, and open space utilization.
<br />The firm assisted with multiple public outreach efforts
<br />including conceptual graphics and renderings to support
<br />meetings with homeowner association groups. Miller Legg
<br />surveyors used 3D laser scanning equipment to collect and
<br />process LiDAR data in preparation for project conceptual
<br />design data needs.”
<br />trail, associated drainage and roadway pedestrian crossings.
<br />The firm also carried out Preliminary Natural Resource and
<br />Protected Species Investigations and documents related
<br />to designation of the Project by FDOT as a Documented
<br />Categorical Exclusion. The project was funded by a SUN Trail
<br />Grant through FDOT.
<br />City of Miami Gardens Rolling Oaks Regional Park
<br />- Renovations of the Rolling Oaks Regional Park included
<br />construction of a new one-story 4,000 SF recreation building,
<br />renovated restroom facilities, expansion of walking trail with
<br />lighting, distance marker, and exercise stations, new pavilions,
<br />new parking lot, refurbished basketball and tennis courts,
<br />new fencing, new shaded playgrounds, new landscaping and
<br />irrigation, addition of horseshoe pits, sand volleyball, mini
<br />golf, and video system and WIFI. Miller Legg provided civil
<br />engineering, landscape architecture, surveying and SUE
<br />services for this 40-acre park as a subconsultant to Synalovski,
<br />Romanik and Saye Architects. The civil scope included design
<br />of a lift station and on-site force main extension to service
<br />the proposed Welcome Center. An arborist assessment
<br />of existing trees and palms was carried out as part of the
<br />landscape architecture services.
<br />City of Hollywood Sunset Park Master Plan
<br />Implementation - Miller Legg is providing multidisciplinary
<br />architectural and engineering services for the implementation
<br />of the City of Hollywood’s Sunset Park Master Plan,
<br />transforming the former 40-acre Sunset Golf Course into the
<br />City’s largest passive public park. Services include surveying,
<br />subsurface utility engineering (SUE), environmental consulting,
<br />geotechnical engineering, architecture, MEP engineering, civil
<br />engineering, landscape architecture, lighting design, permitting
<br />assistance and preparation of site plans and construction
<br />documents. The project supports the City’s vision of creating
<br />a signature community park that enhances recreational
<br />opportunities, preserves natural resources and provides open
<br />space for generations to come.
<br />Broward County Parks and Recreation West Lake
<br />Park II - Environmental Services - Permitting and design
<br />of enhancements for the second phase of this 1,500-acre
<br />estuarine wetland. The firm provided both environmental
<br />and engineering services for necessary mitigation for the
<br />Port Everglades and Ft. Lauderdale-Hollywood International
<br />Airport expansion projects. Services provided included:
<br />paving and drainage improvements for the nature center
<br />and associated parking lot, design of three sewage pump
<br />stations, water distribution system design, sanitary sewage
<br />collection and transmission system design, off-site force
<br />main, traffic engineering, surveying, water quality data
<br />analysis, hypothesis development and review, sediment
<br />analysis, fishery analysis, rip-rap design, benthic macro-
<br />Sandro Elvir, CST I
|