|
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190
<br />| Page 56 Staffing - Surveying / MappingSection 3
<br />Services Contract. Justin Architects will provide conceptual
<br />designs for the renovation of the existing breezeway, campus
<br />signage and wayfinding and monument signs.
<br />Broward County Andrews Avenue Corridor Design
<br />Improvements - For this County roadway corridor
<br />improvement project between Oakland Park Boulevard and
<br />NW 13th Street, Miller Legg provided permitting, irrigation
<br />and landscape architecture plans for median tree relocations
<br />for the on and off-site plantings. In addition, the firm provided
<br />GIS and surveying services including 3D laser scanning in the
<br />field, processing the point clouds (registration, classification,
<br />conversions etc.) and digitized the point clouds to produce
<br />the DTM maps. Miller Legg was a subconsultant to Marlin
<br />Engineering for this Broward County Transportation Surtax
<br />funded project.
<br />Suwannee County Project Summit Master Plan - Miller
<br />Legg will prepare a Master Plan for the Project Summit parcel.
<br />The Master Plan addresses the parcel’s future facilities, uses,
<br />programs and recommend modifications, improvements
<br />and enhancement to create a hurricane shelter and sports
<br />tourism destination. The proposed hurricane shelter shall
<br />double as a destination sports tourism fieldhouse for both
<br />local and regional residents. The master plan will include both
<br />active and passive facilities.
<br />Everglades Holiday Park Arena - Providing survey,
<br />geotechnical, environmental, civil, mechanical, structural
<br />engineering, landscape architecture, permitting assistance
<br />and construction phase services for the proposed arena at
<br />Everglades Holiday Park.
<br />City of Hollywood Harrison Street Parking Garage -
<br />Miller Legg is providing professional surveying, subsurface
<br />utility engineering, civil engineering, landscape architecture,
<br />irrigation design, construction administration, and limited
<br />construction observation services to support the design,
<br />permitting, construction, and project close-out of a design-
<br />build 350-space parking garage with City administrative
<br />and operational facilities. These services help ensure a
<br />coordinated, efficient project delivery from initial design
<br />through final completion.
<br />and associated parking lot, design of three sewage pump
<br />stations, water distribution system design, sanitary sewage
<br />collection and transmission system design, off-site force
<br />main, traffic engineering, surveying, water quality data
<br />analysis, hypothesis development and review, sediment
<br />analysis, fishery analysis, rip-rap design, benthic macro-
<br />invertebrate identification, seagrass survey, mitigation credit
<br />determination, and USACE dredge and fill permitting. The
<br />seagrass survey was conducted using scuba diving and digital
<br />global positioning satellite equipment and included transect/
<br />quadrant measurements of seagrass density, abundance, and
<br />frequency of occurrence.
<br />Upland Park Mixed-Use Development Phase 1 - Miller
<br />Legg is providing environmental and landscape architecture
<br />services for the development of a proposed Miami-Dade
<br />County 44-acre mixed-use development containing 30
<br />acres of undeveloped upland with some dispersed wetlands.
<br />The scope of services comprises jurisdictional wetland
<br />documentation and habitat evaluation for presence of Federal
<br />and State listed species for permitting purposes. Miller Legg
<br />is responsible for Preliminary Natural Resource Permitting
<br />investigations, a Wetland Jurisdictional Determination, a
<br />Natural Resources Evaluation Report covering threatened
<br />and endangered species, Environmental Resource Permitting
<br />for applications to the USACOE/FDEP, SFWMD and Miami-
<br />Dade DERM, along with RAI responses. Firm biologists
<br />conducted a Florida Bonneted Bat Limited Roost Survey to
<br />determine whether the mature trees within the project area
<br />were being used as roosting areas by this endangered species.
<br />Miller Legg prepared a certified arborist review report
<br />incorporating the Park and Ride project parcel component and
<br />landscape architecture services. The landscape architecture
<br />scope includes hardscape, site amenities, landscape, landscape
<br />lighting, irrigation schematic design, design development and
<br />construction documents.
<br />City of Coconut Creek Government Center
<br />Improvements - Miller Legg is providing survey, civil
<br />engineering, landscape architecture, arborist and architecture
<br />design services for the proposed improvements to the
<br />Coconut Creek Government Center. Scope includes removal
<br />of overgrown vegetation and palms in plaza, seating areas and
<br />event space incorporated into the plaza, parking lot design
<br />for additional parking spaces, enhancement of the breezeway
<br />including seating zones and updated finish improvements,
<br />investigate replacement of City Hall sewer lines, drainage
<br />inventory and analysis in the plaza and breezeway, monument
<br />and directional signage throughout the site, conceptual
<br />location of electrical improvements in the courtyard for
<br />future connections, graphics and data provided for grant
<br />assistance and Order of Magnitude Opinion of Probable Cost
<br />(OPC). This work is being performed under our Continuing
<br />Arnold Haynes, PSM
|