|
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190
<br />| Page 57 Staffing - Surveying / MappingSection 3
<br />Biscayne Everglades Greenway Trail (BEGT). The Study Area
<br />is from the C-103 Canal Crossing at East Mowry Drive to the
<br />192nd Avenue intersection with West Mowry Drive. Miller
<br />Legg’s scope comprises compilation of an existing conditions
<br />inventory, preparation of a matrix of criteria to use in the
<br />evaluation of the potential trail alignments, preparation of
<br />various preliminary alignment alternatives with Opinions of
<br />Probable Cost, development of a preferred alignment with
<br />location, typical design, proposed enhancements, right of way/
<br />property issues associated with implementation, potential
<br />property acquisitions, followed by creation of the Feasibility
<br />Report for presentation to the City Council. The Study was
<br />funded by an FDOT SUN Trail Grant.
<br />City of Miami West End Park Survey & SUE - Miller
<br />Legg provided boundary and topographic surveying services
<br />along with an underground utility survey of West End Park
<br />in Miami. The 7-acre active park offers playground, swimming
<br />pool, baseball, tennis, pavilion and picnic facilities in addition
<br />to a community center.
<br />City of Homestead Biscayne-Everglades Greenway Trail
<br />- Among the services Miller Legg provided for this 3.2 mile,
<br />12-foot-wide Biscayne Everglades Greenway shared-use trail
<br />project are landscape architectural, engineering, surveying
<br />and environmental services including preparation of FDOT-
<br />approved construction documents, design of regulatory and
<br />wayfinding signs, pavement markings, safe pedestrian push
<br />button crossing and necessary drainage within the C-103
<br />Canal right-of-way from East Mowry Drive to SW 137th
<br />Avenue in Homestead. The scope of services was based upon
<br />a 2017 Florida Shared-use Non-Motorized Trail Agreement
<br />between the City of Homestead and FDOT. Topographic
<br />and SUE services were delivered. The scope included
<br />engineering design and permitting services for the shared-use
<br />trail, associated drainage and roadway pedestrian crossings.
<br />The firm also carried out Preliminary Natural Resource and
<br />Protected Species Investigations and documents related
<br />to designation of the Project by FDOT as a Documented
<br />Categorical Exclusion. The project was funded by a SUN Trail
<br />Grant through FDOT
<br />City of Miami Gardens Rolling Oaks Regional Park
<br />- Renovations of the Rolling Oaks Regional Park included
<br />Professional Experience:
<br />Ms. Podolskaya is a Senior Survey CAD Technician who
<br />specializes in right-of-way surveying, boundary surveying
<br />and construction layout. She has worked on boundary,
<br />topographic, right-of-way, engineering design, construction
<br />layout, and control surveys overseeing and assisting
<br />with numerous projects for the Florida Department of
<br />Transportation, utilizing MicroStation. She also is experienced
<br />in AutoCAD working with numerous government and private
<br />sector clients including municipalities and counties, as well as
<br />for educational facilities and health care clients, and private
<br />developers.
<br />Relevant Project Experience:
<br />City of Sunny Isles Beach Gwen Margolis Park and
<br />Pelican Community Park Artificial Turf - The project
<br />consisted of the reconstruction of existing natural turf fields
<br />at Pelican Community Park and Senator Gwen Margolis Park
<br />in the City of Sunny Isles Beach with artificial turf. Miller
<br />Legg provided the preparation and permitting of drainage
<br />plans to collect under the new drain systems installed as
<br />part of the project, as well as surveying services. In addition,
<br />construction observation was provided to verify compliance
<br />with the plans and for the certification of the project through
<br />regulatory agencies.
<br />City of Miami E.G. Sewell Park - Under contract with
<br />the City for program development, pre-design, master
<br />planning design, public involvement workshops, construction
<br />documents and construction administration services.
<br />The scope of services includes landscape architecture,
<br />environmental, civil engineering, topographical surveying,
<br />SUE, arborist, structural engineering, electrical engineering,
<br />geotechnical engineering, archeological, permitting, bidding
<br />assistance and limited construction administration.
<br />City of Homestead Biscayne Everglades Trail Western
<br />Expansion Feasibility Study - Miller Legg was retained to
<br />conduct a feasibility study to assist the City of Homestead
<br />in determining the preferred 3-mile route and trail design
<br />for the alignment of the Western Extension of the existing
<br />Years of Experience: 31
<br />Registrations & Certifications:
<br />Certified Survey Technician, FL, 2008
<br />Education:
<br />Bachelor of Science, Electrical Engineering
<br />Kiev Polytechnical University, Kiev, UK, 1987
<br />Larisa Podolskaya, CST
<br />Senior Survey CAD Technician | lpodolskaya@millerlegg.com | 954-628-3677
|