|
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190
<br />| Page 58 Staffing - Surveying / MappingSection 3
<br />Port Everglades and Ft. Lauderdale-Hollywood International
<br />Airport expansion projects. Services provided included:
<br />paving and drainage improvements for the nature center
<br />and associated parking lot, design of three sewage pump
<br />stations, water distribution system design, sanitary sewage
<br />collection and transmission system design, off-site force
<br />main, traffic engineering, surveying, water quality data
<br />analysis, hypothesis development and review, sediment
<br />analysis, fishery analysis, rip-rap design, benthic macro-
<br />invertebrate identification, seagrass survey, mitigation credit
<br />determination, and USACE dredge and fill permitting. The
<br />seagrass survey was conducted using scuba diving and digital
<br />global positioning satellite equipment and included transect/
<br />quadrant measurements of seagrass density, abundance, and
<br />frequency of occurrence.
<br />City of Hollywood Sunset Park Master Plan
<br />Implementation - Miller Legg is providing multidisciplinary
<br />architectural and engineering services for the implementation
<br />of the City of Hollywood’s Sunset Park Master Plan,
<br />transforming the former 40-acre Sunset Golf Course into the
<br />City’s largest passive public park. Services include surveying,
<br />subsurface utility engineering (SUE), environmental consulting,
<br />geotechnical engineering, architecture, MEP engineering, civil
<br />engineering, landscape architecture, lighting design, permitting
<br />assistance and preparation of site plans and construction
<br />documents. The project supports the City’s vision of creating
<br />a signature community park that enhances recreational
<br />opportunities, preserves natural resources and provides open
<br />space for generations to come.
<br />City of Weston Vista Park Phase II Recreation Center
<br />- Miller Legg is providing survey, SUE, landscape architecture,
<br />and civil engineering for the development of a new 40,000
<br />SF recreation center with a multipurpose gymnasium with
<br />three basketball courts, an upstairs running track, a fitness/
<br />activity room, multipurpose rooms, break room, bathrooms,
<br />storage, standby power, and other required and support
<br />spaces. The park site will also contain a shaded playground,
<br />splashpad, multipurpose courts, shade structure, and a new
<br />exit/access drive to Vista Park Boulevard. The recreation
<br />complex aims to provide Weston residents with year-round
<br />programming beyond traditional outdoor spaces. Miller Legg
<br />is a subconsultant to Wannemacher Jensen Architects for
<br />this project.
<br />City of Coconut Creek Copans Road Median Landscape
<br />Architecture Plans - For this median improvement
<br />project along Copans Road between Lyons Road and the
<br />Florida Turnpike Overpass, Miller Legg provided landscape,
<br />hardscape and irrigation design plans, tree inventory,
<br />surveying, permitting, pre-construction and construction
<br />observation services to the City. Tree, streets and highway
<br />permitting was coordinated with Broward County.
<br />construction of a new one-story 4,000 SF recreation building,
<br />renovated restroom facilities, expansion of walking trail with
<br />lighting, distance marker, and exercise stations, new pavilions,
<br />new parking lot, refurbished basketball and tennis courts,
<br />new fencing, new shaded playgrounds, new landscaping and
<br />irrigation, addition of horseshoe pits, sand volleyball, mini
<br />golf, and video system and WIFI. Miller Legg provided civil
<br />engineering, landscape architecture, surveying and SUE
<br />services for this 40-acre park as a subconsultant to Synalovski,
<br />Romanik and Saye Architects. An arborist assessment
<br />of existing trees and palms was carried out as part of the
<br />landscape architecture services.
<br />City of Miami Museum Park Baywalk Phase 3 - Miller Legg
<br />provided landscape architecture, civil engineering, lighting/
<br />electrical engineering, surveying, permitting and limited
<br />construction administration services for the Miami Baywalk
<br />Phase 3 Project. Permitting for project improvements was
<br />provided through the City of Miami, Miami-Dade County
<br />and South Florida Water Management District. Underground
<br />utility designation for electric and drainage utilities was
<br />performed. The project is a 1/4-mile pedestrian-oriented
<br />urban waterfront park and promenade on Biscayne Bay,
<br />located adjacent to the east coast greenway. The Baywalk
<br />design includes custom native stone benches, extensive paver
<br />pedestrian spaces, salt-tolerant tropical plantings, as well as
<br />themed lighting and site amenities. The planting design not
<br />only enhanced aesthetics, but also buffered unsightly adjacent
<br />parking and utility areas and minimized exposed surfaces that
<br />had been subject to graffiti. This project was performed under
<br />our Miscellaneous Landscape Architectural Services contract.
<br />City of Miami Beach Chase Avenue and 34th Street
<br />Shared Path - Under its continuing services agreement with
<br />the City of Miami Beach, Miller Legg was retained to provide
<br />surveying, civil engineering and landscape architecture services
<br />related to the new Chase Avenue and 34th Street shared
<br />path and roadway improvements project. The 10-ft shared
<br />use path supports the use of simultaneous pedestrian and
<br />bicycle activity. The scope of services included topographic
<br />surveying, tree inventory, disposition and permitting; irrigation,
<br />landscape, hardscape and amenities design, site civil design
<br />development for clearing/demolition, signage and marking,
<br />paving, grading, drainage and erosion control/pollution
<br />prevention. Miller Legg was also responsible for permitting
<br />coordination with the City and Miami-Dade DERM, as well as
<br />bidding assistance/contract administration and construction
<br />phase tasks including construction observation.
<br />Broward County Parks and Recreation West Lake
<br />Park II - Environmental Services - Permitting and design
<br />of enhancements for the second phase of this 1,500-acre
<br />estuarine wetland. The firm provided both environmental
<br />and engineering services for necessary mitigation for the
<br />Larisa Podolskaya, CST
|