Laserfiche WebLink
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190 <br />| Page 59 Staffing - Surveying / MappingSection 3 <br />led by the City and Community Redevelopment Agency, <br />contributing to improved walkability, enhanced public spaces, <br />and long-term economic and civic investment in Downtown <br />Homestead. <br />City of Homestead Biscayne Everglades Trail Western <br />Expansion Feasibility Study - Miller Legg was retained to <br />conduct a feasibility study to assist the City of Homestead <br />in determining the preferred 3-mile route and trail design <br />for the alignment of the Western Extension of the existing <br />Biscayne Everglades Greenway Trail (BEGT). The Study Area <br />is from the C-103 Canal Crossing at East Mowry Drive to the <br />192nd Avenue intersection with West Mowry Drive. Miller <br />Legg’s scope comprises compilation of an existing conditions <br />inventory, preparation of a matrix of criteria to use in the <br />evaluation of the potential trail alignments, preparation of <br />various preliminary alignment alternatives with Opinions of <br />Probable Cost, development of a preferred alignment with <br />location, typical design, proposed enhancements, right of way/ <br />property issues associated with implementation, potential <br />property acquisitions, followed by creation of the Feasibility <br />Report for presentation to the City Council. The Study was <br />funded by an FDOT SUN Trail Grant. <br />Miami-Dade County Water and Sewer Department <br />(WASD) El Portal Basin Surveying - Under Miller Legg’s <br />WASD Continuing Services Contract, the firm provided a <br />topographic survey along the entire right-of-way at six (6) <br />streets and intersections and extended 100 feet beyond the <br />intersections’ return curves. The six locations in the El Portal <br />neighborhood of Miami-Dade County included: West end of <br />NW 87th ST & NW 5th Ave., NW 95th St. and NW 6th <br />Ave., NW 95th St. and NW 2nd Ave., NE 95th St. and N. <br />Miami Ave., 100 LF south of NE 91st St. and NE 1st St., and <br />70 LF NE of NE 86th St. and NE 1st St. <br />City of Hollywood Sunset Park Master Plan <br />Implementation - Miller Legg is providing multidisciplinary <br />architectural and engineering services for the implementation <br />of the City of Hollywood’s Sunset Park Master Plan, <br />transforming the former 40-acre Sunset Golf Course into the <br />City’s largest passive public park. Services include surveying, <br />subsurface utility engineering (SUE), environmental consulting, <br />Professional Experience: <br />Mr. Zare is a GIS Coordinator with experience providing GIS <br />services. He has experience in geospatial and remote sensing <br />data analysis. He is proficient in designing and implementing <br />GIS solutions to address complex spatial challenges. Specific <br />experience he has includes geospatial data processing, digital <br />image processing, geospatial analysis, GIS programming, Web <br />GIS development, unmanned aerial systems, remote sensing <br />of the environment, computer vision and photogrammetry. <br />Mr. Zare’s software experience includes use of ESRI software <br />package, ArcGIS, ENVI, eCognition Developer, AutoCAD, <br />Pix4D, Trimble Business Center, Microsoft Office, ESRI <br />applications (Survey 123, Experience Builder, Web AppBuilder <br />and Dashboards). Prior to joining Miller Legg, Mr. Zare was <br />a GIS Specialist for four years extensively working on the <br />preparation of existing land use maps, cartography, schematic <br />GIS design and structure plans using GIS technology and <br />ArcGIS software. <br />Relevant Project Experience: <br />City of Homestead Downtown Landscape Master Plan <br />- Under our Continuing Services Contract with the City of <br />Homestead, Miller Legg is preparing a comprehensive Master <br />Landscape Concept for five prominent gateway intersections <br />serving Historic Downtown Homestead. These intersections <br />- Krome Avenue and Flagler Avenue, Mowry Drive and the <br />Busway, the Busway corridor from Mowry Drive to NE 2nd <br />Street, NE 2nd Drive at the Busway, and Campbell Drive at <br />Flagler Avenue and the Busway - function as key arrival points <br />and visual thresholds into the downtown district. The master <br />concept will support the City’s broader redevelopment and <br />streetscape initiatives by establishing cohesive landscape and <br />placemaking strategies that enhance downtown identity, <br />improve pedestrian comfort, and strengthen multimodal <br />connectivity. The effort focuses on creating a unified landscape <br />framework through coordinated plant palettes, conceptual <br />hardscape features, and gateway elements that reinforce a <br />sense of place while accommodating transit, vehicular, bicycle, <br />and pedestrian activity. The Master Landscape Concept aligns <br />with ongoing and planned downtown revitalization efforts <br />Years of Experience: 9 <br />Registrations & Certifications: <br />Certified GIS Professional, 2025 <br />Education: <br />Masters of Arts and Enviornemntal Sciences, Civil <br />Engineering, Geomatics and Transportation <br /> Florida Atlantic University, 2024 <br />Master of Science, Remote Sensing & Geographic <br />Information Systems <br /> Univeristy of Tabriz, 2017 <br />Bachelor of Science, Architectural Engineering <br /> Urmia University, 2013 <br />Saeid Zare, GISP <br />GIS Coordinator | szare@millerlegg.com | 954-327-9646