Laserfiche WebLink
RFQ #26-07-01 Continuing Professional Architectural and Engineering Consulting Services | 26MLA00190 <br />| Page 61 Staffing - Surveying / MappingSection 3 <br />and Upgrade - Under the firm’s WASD Continuing Services <br />Contract, Miller Legg is providing engineering design, surveying <br />and landscape architecture services for the relocation, <br />rehabilitation and upgrade of wastewater pump station 0831 <br />to provide better access to the station. <br />Seminole Tribe of Florida (STOF) ERMD Water Quality <br />Data QA/QC & WQX Data Uploading - Miller Legg <br />provided water quality data management and uploading <br />support to the Seminole Tribe specifically, review and <br />recommendation of data management options, ongoing <br />orientation training and coordination with Tribe ERMD staff, <br />and QA/QC of incoming datasets and upload of the data. This <br />water quality data is required for compliance with the EPA <br />Clean Water Act and grant requirements. <br />City of Hollywood Sunset Park Master Plan <br />Implementation - Miller Legg is providing multidisciplinary <br />architectural and engineering services for the implementation <br />of the City of Hollywood’s Sunset Park Master Plan, <br />transforming the former 40-acre Sunset Golf Course into the <br />City’s largest passive public park. Services include surveying, <br />subsurface utility engineering (SUE), environmental consulting, <br />geotechnical engineering, architecture, MEP engineering, civil <br />engineering, landscape architecture, lighting design, permitting <br />assistance and preparation of site plans and construction <br />documents. The project supports the City’s vision of creating <br />a signature community park that enhances recreational <br />opportunities, preserves natural resources and provides open <br />space for generations to come. <br />Upland Park Mixed-Use Development Phase 1 - Miller <br />Legg is providing environmental and landscape architecture <br />services for the development of a proposed Miami-Dade <br />County 44-acre mixed-use development containing 30 <br />acres of undeveloped upland with some dispersed wetlands. <br />The scope of services comprises jurisdictional wetland <br />documentation and habitat evaluation for presence of Federal <br />and State listed species for permitting purposes. Miller Legg <br />is responsible for Preliminary Natural Resource Permitting <br />investigations, a Wetland Jurisdictional Determination, a <br />Natural Resources Evaluation Report covering threatened <br />and endangered species, Environmental Resource Permitting <br />Professional Experience: <br />Mr. Chaskalson is a Drone Pilot and Environmental Technician <br />providing field reviews, wetland delineations, permitting, field <br />work, surveying, scanning, and agency coordination for our <br />clients. Kevin is proficient in ArcGIS and GPS, environmental <br />sampling techniques, scientific monitoring and data methods, <br />and hazardous materials and environmental air quality. <br />Relevant Project Experience: <br /> <br />City of Homestead Biscayne-Everglades Greenway Trail <br />- Among the services Miller Legg provided for this 3.2 mile, <br />12-foot-wide Biscayne Everglades Greenway shared-use trail <br />project are landscape architectural, engineering, surveying <br />and environmental services including preparation of FDOT- <br />approved construction documents, design of regulatory and <br />wayfinding signs, pavement markings, safe pedestrian push <br />button crossing and necessary drainage within the C-103 <br />Canal right-of-way from East Mowry Drive to SW 137th <br />Avenue in Homestead. The scope of services was based upon <br />a 2017 Florida Shared-use Non-Motorized Trail Agreement <br />between the City of Homestead and FDOT. Topographic <br />and SUE services were delivered. The scope included <br />engineering design and permitting services for the shared-use <br />trail, associated drainage and roadway pedestrian crossings. <br />The firm also carried out Preliminary Natural Resource and <br />Protected Species Investigations and documents related <br />to designation of the Project by FDOT as a Documented <br />Categorical Exclusion. The project was funded by a SUN Trail <br />Grant through FDOT. <br />Miami-Dade County Water and Sewer Department <br />(WASD) E15-WASD-02 Pump Station 0812 Relocation <br />and Upgrade - Under the firm’s WASD Continuing Services <br />Contract, Miller Legg is providing engineering design, surveying <br />and landscape architecture services for the relocation, <br />rehabilitation and upgrade of wastewater pump station <br />0812 to provide better access to the station. Miller Legg is <br />currently preparing the finalized bid package for construction <br />advertisement. <br />Miami-Dade County Water and Sewer Department <br />(WASD) E15-WASD-02 Pump Station 0831 Relocation <br />Years of Experience: 4 <br />Registrations & Certifications: <br />Remote Pilot Certification, FL, 2024 <br />FDEP Stormwater, Erosion & Sedimentation <br />Inspector, FL, 2023 <br />Education: <br />Associate in Arts, General Education <br />University of North Florida, 2006 <br />Associate of Science, Environmental Science <br />Technology <br />Palm Beach State College, 2002 <br />Kevin Chaskalson <br />Drone Pilot | kchaskalson@millerlegg.com | 954-628-3634