My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moffatt & Nichol Bid Document (5)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Moffatt & Nichol
>
Moffatt & Nichol Bid Document (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:33:54 PM
Creation date
8/31/2026 1:32:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALIFICAtIoNS 55P261925RFQ # 26-07-01 • CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />Citywide Dune Management Plan <br />Moffatt & Nichol was retained to assist the City with <br />developing an updated Dune Management Plan to <br />address dune maintenance and creation goals and <br />provide a road map for the prioritized management and <br />implementation of dune restoration and enhancement <br />projects. Moffatt & Nichol conducted a comprehensive <br />assessment of the dune vegetation in order to identify <br />areas of concern and provide recommendations for <br />the ideal dune conditions that the City should strive to <br />maintain. Moffatt & Nichol’s assessment found that the <br />City’s ongoing efforts to manage its dune ecosystem <br />have resulted in a largely healthy and robust dune <br />vegetation community characterized by the prevalence <br />of a diverse palette of native species. After initial <br />assessments and mapping efforts were complete, <br />Moffatt & Nichol assisted in drafting the updated Dune <br />Master Plan. <br />The plan included a <br />management approach <br />for dune projects with <br />immediate and long- <br />term shore protection, including recommendations <br />for dune fill to increase dune stability; ecological <br />and aesthetic benefits, such as reinforcing sparsely <br />vegetated areas; and provided guidelines for design, <br />permitting, future maintenance efforts, and possible <br />federal and state grant opportunities. <br />Monument Island Restoration <br />Moffatt & Nichol was retained by the City for the <br />proposed environmental restoration of Flagler Memorial <br />Island, aka Monument Island located within the <br />Biscayne Bay Aquatic Preserve in the City of Miami <br />Beach, Florida. <br />Miami Beach, Florida <br />Client/OwnerCity of Miami Beach <br />Representative ContactLindsey Precht <br />Deputy Resilience Officer • Environment & Sustainability Assistant Director <br />1700 Convention Center Dr <br />Miami Beach, FL 33139 <br />(305) 673-7084 Ext. 26008 <br />lindsey.precht@miamibeachfl.org <br />Contract DatesSee projects <br />Contract AmountSee projects <br />Relevancy <br /> ;Citywide dune management planning <br /> ;Shore protection dune restoration <br /> ;Habitat and shoreline stabilization <br /> ;Managed mooring field designContract Dates2024 <br />Contract Amount$68,000 <br />Contract Dates2025–Ongoing <br />Contract Amount$248,000 <br />Miami Beach Coastal Projects
The URL can be used to link to this page
Your browser does not support the video tag.