QUALIFICAtIoNS 56P261925RFQ # 26-07-01 • CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />Miami Beach Mooring Field <br />Moffatt & Nichol was retained as a subconsultant to <br />RES to evaluate conceptual design alternatives for a <br />managed mooring field near the Venetian Causeway <br />within Biscayne Bay. Moffatt & Nichol coordinated <br />bathymetry and marine resource mapping of areas <br />extending from Sunset Harbor Yacht Club south to <br />approximately 14th Street along the Biscayne Bay <br />waterfront. <br />Conceptual designs were developed to optimize the <br />perimeter of the mooring field and to size the swing <br />circles based on anticipated environmental permitting <br />guidelines. Initial phases were identified along <br />with perimeter buffers around adjacent waterfront <br />properties and navigation channels. <br />The Project includes design and permitting services <br />for the creation of a mangrove planter with riprap <br />revetment along the shoreline, the planting of native <br />vegetation to restore habitat in the upland portions of <br />the island, replacement of the existing elevated osprey <br />nest platform, and the installation of eight regulatory <br />buoys for the creation of a motorized vessel exclusion <br />zone and swim only area surrounding the island. <br />Monument Island is an uninhabited, man-made <br />island located between the MacArthur and Venetian <br />Causeways in Biscayne Bay. The site was designated <br />as a local historic site by the City of Miami Beach in <br />2002. The Flagler Memorial located on the island is <br />one of the few remaining public works of art from the <br />1920’s. The island has become a popular destination <br />for boaters and other recreational users. <br />However, this has also led to the degradation of <br />the existing habitat, damage to submerged aquatic <br />vegetation, excessive littering on the island, and <br />vandalism. The purpose of the project is to stabilize the <br />shoreline, restore the upland protect marine resources <br />and the historic monument, and enhance public safety <br />on the island. <br />Contract Dates2019–2027 (Est.) <br />Contract Amount$134,000 <br />A phasing plan was compiled to provide the City with <br />areas suitable for mooring field expansion between the <br />Venetian and MacArthur Causeways. <br />Working with the team to review historical mooring and <br />anchoring trends in the area, upland programming to <br />support a mooring field was developed, including dingy <br />docks, sewage pump-outs, and a dockmaster office. <br />Construction cost estimates were developed, along <br />with a review of annual revenue based on comparable <br />managed mooring fields. Moffatt & Nichol completed <br />the engineering design of the selected mooring field <br />configuration. Subaqueous utilities were mapped and <br />the mooring field was adjusted and the submerged <br />lease limits expanded. Moffatt & Nichol also consulted <br />with the City on the development of the mooring field <br />ordinance. Environmental permits are currently being <br />processed with construction anticipated to commence <br />in 2027. <br />Marine Patrol Dock <br />Moffatt & Nichol was retained by the City of Miami <br />Beach to provide design and permitting services for <br />the consolidation of police and fire marine operations <br />into a single, centralized law enforcement dock facility <br />at Maurice Gibb Park. The project includes removal <br />of the existing docking structures and construction <br />of a new docking facility with increased capacity to <br />accommodate a total of 9 slips on boat lifts for the <br />full fleet of the City’s public safety vessels. The new <br />dock will provide a safe, efficient, and resilient marine <br />operations facility capable of supporting the combined <br />marine units. Seagrass surveys were conducted and <br />the dock was designed to avoid impacts to marine <br />resources. Moffatt & Nichol provided full utility design <br />for the boat lifts as well as for specialized lighting to <br />facilitate emergency operations. <br />Contract Dates2024–Ongoing <br />Contract Amount$186,000