StAFFING 73P261925RFQ # 26-07-01 • CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />Construction Estimator
<br />Total Years Experience / With Moffatt & Nichol 35 / 5
<br />Education MBA, Northern Illinois University, 2001
<br />BA, Business Management, North Central College, 1992
<br />BA, Speech Communications, North Central College, 1992
<br />Certification Certified Professional Estimator (CPE), American Society of Professional Estimators, 2022
<br />Miami Harbor Entrance Channel Deepening, Miami, FL. Senior estimator for this
<br />$200 million project to deepen the Miami Harbor channel entrance. Work included
<br />dredging 5 million cubic yards with hydraulic, hopper, and mechanical dredges.
<br />Construction included a 17-acre seagrass mitigation site, 9 acres of artificial reef,
<br />and 7 acres of seagrass plantings. Developed internal cost estimates to bid this
<br />project and explore countless options to secure the best bid. Once the project
<br />was procured, developed monthly estimate updates by tracking actual costs and
<br />production and incorporating future planning based on site developments.
<br />Dauphin Island Causeway Shoreline Restoration, Mobile County, AL.
<br />Construction estimator for the shoreline restoration of the Dauphin Island
<br />Causeway for the Mobile County Environmental Services Department. The project
<br />consisted of constructing 150,000 tons of nearshore rock breakwaters and the
<br />dredging of approach and flotation channels. Involved in project from initial to final
<br />design. Provided cost estimates during the various design stages. Assisted with
<br />the review of contract specifications and contract drawings and held discussions
<br />with potential contractors for feedback during the design stages.
<br />Upper Mobile Bay Beneficial-Use Wetland Creation Site (Planning), Mobile,
<br />AL. Construction estimator for the development of a 1,200-acre wetland creation
<br />site in Upper Mobile Bay for the Alabama State Port Authority. The project
<br />includes features such as constructing dredge-filled containment dikes, installing
<br />rock revetments, excavating tidal creeks, constructing access channels, and
<br />constructing a material offloading facility. Working with design engineers on cost
<br />estimates for many different methodologies of containment dikes, borrow sources,
<br />and revetments to arrive at the most costeffective solution. Providing a review of
<br />geotechnical data for the most efficient areas of dike placement, as well as potential
<br />borrow material sources.
<br />Increase Atchafalaya Flow to Terrebonne, Terrebonne Parish, LA. Construction
<br />estimator for dredging and shoreline protection for Project TE-110 for the Louisiana
<br />Coastal Protection and Restoration Authority. The project is currently at 30 percent
<br />design. Provided cost estimates for placement of 300,000 tons of rock for scour
<br />protection and dredging and disposal of over 2.7 million cubic yards, as well as
<br />pipeline relocations. Coordinating with potential contractors during the 30 percent
<br />design/estimating phase regarding estimated costs, methods of disposal of
<br />dredge material, production rates, and scheduling.
<br />Seann Perez CPE
<br />Coastal Estimator/Marine Construction Specialist | Moffatt & Nichol
<br />Seann is a construction estimator with more than 35 years of experience in
<br />the dredging and dredging-related field. As a former lead estimator for the
<br />largest dredging company in North America, he participated in some of the
<br />most high-profile, complex projects in the dredging industry, including several
<br />projects of more than $100 million, including work in iami Harbor and large-
<br />scale beach nourishment projects. He is very familiar with the development
<br />of dredging, beach nourishment, and marsh creation plans and specifications
<br />and understands the constructability of projects to aid in developing cost-
<br />effective projects. His expertise includes dredging and reclamation construction
<br />experience, including cost estimating and proposal preparation, scheduling,
<br />procurement, and market analysis.
|