Laserfiche WebLink
2. Qualifications <br />Owner: Miami-Dade County <br />Consulting costs: $520k <br />Mike Zarlengo, P.S.M. <br />Surveyor, Geospatial <br />Woolpert <br />(678) 537-8927 / 375 Northridge Road, Suite <br />300 Atlanta, GA 30350 <br />Through this continuing services contract, <br />PDS, provides professional land surveying and <br />Subsurface Utility Engineering (SUE) services <br />in support of Miami-Dade Water and Sewer <br />Department (MDWASD) water and wastewater <br />infrastructure projects. PDS has completed <br />multiple work orders, including a Subsurface <br />Utility Engineering (SUE) assignment in the <br />City of Sunny Isles Beach with up to 20 soft <br />digs, as well as 47,368 linear feet of ROW-to- <br />ROW topographic surveys supporting utility <br />infrastructure improvements throughout Miami- <br />Dade County. <br />• PDS is Subconsultant. <br />• The project is currently ongoing. <br />Owner: Miami-Dade County Water & Sewer <br />Department <br />Construction costs: $20M <br />Consulting costs: $3.3M <br />Marisela Aranguiz, P.E. <br />Deputy Director, Capital Improvement Program <br />and Regulatory Compliance <br />786-552-8118 / 3501 NW 46 Street <br />Miami, FL 33142 <br />PDS, as Prime Consultant, is responsible for <br />managing and executing work in close <br />coordination with MDWASD staff, including the <br />preparation of technical memorandums, land <br />surveying, design drawings, cost estimates, <br />project schedules, and technical specifications <br />for work orders. The team has gained extensive <br />experience in water and wastewater system <br />design, specifications, and procedures, <br />performing ROW-to-ROW topographic surveys <br />of roadway segments and implementing water <br />and sanitary sewer improvements to replace <br />undersized and outdated infrastructure. PDS has <br />completed 15 work orders under this program, <br />including engineering design and surveying <br />of over 75,000 linear feet of 8”–10” watermain/ <br />forcemain and more than 30,000 linear feet of <br />8” gravity sewer. <br />• PDS is Prime Consultant. <br />• The project is currently ongoing. <br />E20-WASD-01B <br />General Land and Engineering Surveying <br />and Mapping Services <br />E15-WASD-03A - 17PDSI002 Engineering <br />Design and Related Services for the Design <br />of Small Diameter Water and Wastewater <br />Pipelines <br />E15-WASD-02 Improvement, Upgrade & <br />Expansion of Local Wastewater Pump Station <br />Owner: Miami-Dade Water & Sewer <br />Department <br />Consulting costs: $1.6M <br />Marisela Aranguiz, P.E. <br />Deputy Director, Capital Improvement Program <br />and Regulatory Compliance <br />786-552-8118 / 3501 NW 46 Street <br />Miami, FL 33142 <br />Through this project, PDS is responsible for <br />managing and executing all work in close <br />coordination with MDWASD staff. The scope <br />includes complete engineering design <br />services, such as preliminary site investigation <br />and inspection, surveying, hydraulic analysis, <br />coordination with municipalities and the public, <br />23