|
<br />Experience Summary
<br />and design documentation to support engineering, permitting, and construction activities for the
<br />small-diameter water and wastewater pipeline improvements.
<br />
<br />19-20-019 Citywide Program Management Support Services. Miami-Dade County, FL.
<br />Mr. Prada served as the Survey Technician for this project, supporting the preparation of professional
<br />land surveying deliverables for the East Flagami Stormwater Infrastructure Improvements. His
<br />responsibilities included processing field data, drafting topographic and ROW survey files in AutoCAD,
<br />and detailing property features within the 26,550 LF survey corridor. He documented ROW limits,
<br />roadway and pavement conditions, driveways, sidewalks, curbs and gutters, walls, fences, and other
<br />above-ground elements, as well as the 0.3-acre parcel designated for the new pump station. His work
<br />ensured accurate and complete survey drawings for design and permitting.
<br />
<br />PNC2119245P1 Consultant Services for Transit Surveys, Infrastructure and Shelter Designs. Broward
<br />County, FL.
<br />Mr. Prada served as CAD Technician for this project, supporting Broward County Transit’s bus stop
<br />improvement and installation programs. He was responsible for preparing, organizing, and maintaining
<br />all topographic and engineering data in AutoCAD for more than 500 bus stop locations. His tasks
<br />included developing detailed base files, incorporating survey and utility information, updating design
<br />revisions, ensuring compliance with project standards. He produced coordinated CAD deliverables that
<br />supported civil, structural, permitting, and construction activities throughout the project's duration.
<br />
<br />TRN2120307P1 Broward County Transit Systemwide Study, Planning, And Preliminary Design, Broward
<br />County, FL.
<br />Mr. Prada was the GIS specialist for this project, that required the design team to complete an analysis
<br />that identified suitable transit capital and operational investments on major corridors in Broward County
<br />and provided recommendations for implementing corridor-based Bus Rapid Transit (“BRT”) or fixed
<br />guideway BRT on corridors identified in the TSYS (now branded as PREMO). PDS provided services to
<br />our client WSP USA Inc. in the Oakland Park Boulevard Corridor Development, including Field Review,
<br />Aerial Photography Coordination, Surveying Utilities and Railroads, Roadway Analysis, and Alternatives
<br />Concept Plans. Mr. Prada coordinated drone-based and conventional surveying methods with the crew,
<br />establishing horizontal and vertical control points, ensuring accurate location of all above-ground
<br />features and utilities with the survey team, and overseeing the collection of field data. Mr. Prada
<br />executed the aerial survey covering the whole target area of 16 miles, sectioned in 2 miles per flight.
<br />
<br />PNC2123898P1 Engineering Services for Water and Wastewater Projects - Category 1 - UAZ 225 and
<br />226, Broward County, FL
<br />Mr. Prada served as the CAD Technician for this water main improvement project in UAZ 225 and 226,
<br />supporting surveying, engineering design, and Subsurface Utility Engineering (SUE) efforts along
<br />approximately 26,147 linear feet of public roadways. He was responsible for developing and managing
<br />AutoCAD Civil 3D base files, digitizing topographic survey data and utility information collected from field
<br />investigations and as-builts, and ensuring accuracy and consistency across all deliverables. Mr. Prada
<br />prepared both digital and hard copy files to support engineering design, utility coordination, and
<br />construction-phase activities, contributing to precise mapping, quality-controlled documentation, and
<br />efficient project delivery.
<br />
<br />TRN2128229P1 Airport-Seaport-Convention Center Transportation PD&E Study. Broward County, FL.
<br />Mr. Prada is serving as GIS Specialist, providing field support for topographic surveying activities at the
<br />Port Everglades docks as part of a PD&E Study and preliminary engineering effort for a proposed fixed
<br />guideway transit corridor. His role includes supporting the collection and organization of geospatial and
<br />topographic data related to above- and below-ground features, utilities, and stormwater infrastructure.
<br />He contributes to the creation of a 3D Digital Terrain Model (DTM) using GPS, RTK, and LiDAR
<br />technologies, providing accurate mapping and data inputs used in survey processing, utility
<br />coordination, and preliminary engineering analyses in compliance with NEPA and FDOT PD&E
<br />requirements.
<br />45
|