My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodriguez Architects, Inc. Bid Document (13)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Rodriguez Architects, Inc
>
Rodriguez Architects, Inc. Bid Document (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:40:23 PM
Creation date
8/31/2026 1:39:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROACH/METHODOLOGY <br /> <br /> RFQ 26-07-01 <br />Continuing Professional Consulting Services <br />Kickoff <br />Once the project has been authorized/awarded to us, we will schedule a <br />‘kick-off’ meeting with your project representative and any affected <br />consultants. During this meeting, we will: <br />• collect all pertinent project information <br />• assess work timelines <br />• record all project criteria <br />• review and clarify project communication protocols <br />• identify any project specific needs <br />• collect all available existing documentation to take back to the office <br /> <br />Program Validation <br />To get your project underway, we assess and evaluate the project’s <br />program and unique needs. We will focus on better understanding your <br />goals in relation to the opportunities that the project site presents. We then <br />begin to craft a responsive design propos al that addresses each of your <br />requirements. <br /> <br />Roadmap <br />Once a project has begun, regularly scheduled project meetings with <br />consultants and clients allow RAI to keep close watch over your project <br />while making sure that the work of all parties is coordinated during <br />development and not after the fact or in the fi eld. <br /> <br />RAI’s standard procedures (after the program, budget and schedule are <br />approved) include the following documents: <br />• Preparation of design criteria checklist <br />• Review and coordination of CPTED guidelines applicable to the <br />project and inclusion of those within the design criteria checklist <br />• Review and confirmation of project specific Code requirements <br />• Review and confirmation of the County Design Criteria and <br />specification specific to the project <br />• Development of checklists based on those <br />requirements <br />• Preparation of a schedule for phase <br />submittals, including anticipated deliverables <br />at each milestone <br />• Preparation of project specific drawing list, <br />specification requirements and checklist <br />• Preparation of project specific construction <br />administration checklist <br /> <br />These procedures and their respective checklists <br />provide a roadmap for accomplishing project goals and are used by all key personnel, including the City of <br />Sunny Isles Beach’s project representative. <br /> <br /> <br /> <br /> <br /> <br /> <br />Meeting Minutes <br />Site Visits <br />Roadmap / Project Plan
The URL can be used to link to this page
Your browser does not support the video tag.