My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc. Bid Document (19)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Ross Engineering, Inc
>
Ross Engineering, Inc. Bid Document (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:41:19 PM
Creation date
8/31/2026 1:40:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | General Civil Engineer <br />PAGE 2 <br />Broward County Public Schools Civil Engineering Continuing Services <br />Broward County, FL <br />• Gator Run Elementary School – Weston FL (Indian Trace <br />improvement District) <br />• Manatee Bay Elementary School – Weston FL (Indian Trace <br />improvement District) <br />• Margate Middle School – Margate FL (Cocomar/Broward County) <br />• Monarch High School - Coconut Creek FL (Cocomar/Broward County) <br />• New River Middle School – Fort Lauderdale FL (Broward County) <br />• Northeast High School – Oakland Park FL (Broward County) <br />• Pines Middle School – Pembroke Pines FL (South Broward Drainage <br />District) <br />• Piper High School – Sunrise, FL (Broward County) <br />• Sawgrass Elementary School – Sunrise, FL (Broward County) <br />• Sunset School (Sheridan Technical School) - Fort Lauderdale FL <br />(Broward County) <br />• Water C Young Middle School – Pembroke Pines FL (South Broward <br />Drainage District) <br />• West Broward High School – Pembroke Pines FL (South Broward <br />Drainage District) <br />• William Dandy Middle School – Fort Lauderdale FL (Broward County) <br />The certifications for these schools were promptly submitted and <br />successfully certified, all while remaining within the task work order <br />budget negotiated for each school. The firm accomplished this feat <br />by meticulously adhering to a proactive approach of meeting with all <br />stakeholders including School Board project management, school <br />principals and maintenance staff, School Board building dept officials and <br />county and local drainage district staff. This approach ensured that time <br />and budgetary constraints were met with precision. <br /> •Piper High School – Sunrise, FL (Broward County) <br /> •Sawgrass Elementary School – Sunrise, FL (Broward County) <br /> •Sunset School (Sheridan Technical School) - Fort Lauderdale FL (Broward County) <br /> •Water C Young Middle School – Pembroke Pines FL (South Broward Drainage District) <br /> •West Broward High School – Pembroke Pines FL (South Broward Drainage District) <br /> •William Dandy Middle School – Fort Lauderdale FL (Broward County) <br />The certifications for these schools were promptly submitted and successfully certified, all while remaining <br />within the task work order budget negotiated for each school. The firm accomplished this feat by <br />meticulously adhering to a proactive approach of meeting with all stakeholders including School Board <br />project management, school principals and maintenance staff, School Board building dept officials and <br />county and local drainage district staff. This approach ensured that time and budgetary constraints were <br />met with precision. <br />Services similar to <br />Sunny Isles <br />• Continuing Civil <br />Engineering Services <br />• Stormwater <br />& Drainage <br />Infrastructure <br />Assessments <br />• Five-Year Drainage <br />Recertifications <br />• Drainage Inspections <br />& Certifications <br />• Hydrologic/Hydraulic <br />Studies <br />• ICPR 4.0 & SFWMD <br />CASCADE Modeling <br />• Flooding Evaluations <br />& Mitigation Design <br />• Conceptual & Final <br />Drainage Design <br />• Gravity Wells, <br />Exfiltration Trenches, <br />Swales, Retention <br />Areas & Wet Ponds <br />• Drainage Permitting <br />& Regulatory <br />Coordination <br />• Basis of Design / <br />Drainage Reports <br />• Opinions of Probable <br />Construction Cost <br />• Contractor <br />Coordination & Cost <br />Estimate Review <br />• Construction/ <br />Post-Maintenance <br />Inspections <br />• QA/QC & Project <br />Closeout
The URL can be used to link to this page
Your browser does not support the video tag.