Laserfiche WebLink
SECTION 5 — REFERENCES & PROJECT EXPERIENCE <br />Per RFQ Section 5.0(5) and Evaluation Criterion 4, TEC provides three (3) government agency references — the same <br />clients as Project Description Forms Nos. 1, 2, and 3 under MQR #2 — with signed City Reference Questionnaires <br />(RFQ p. 41 form) at Appendix D. Eleven (11) Project Description Forms follow, each with a contact name and <br />telephone number. <br />Government References (Current & Past Clients) <br />Reference 1 Reference 2 Reference 3 <br />City of North Miami Beach — Public <br />Works <br />Gregory Christian <br />Engineering & Construction Manager <br />(305) 948-2967 x7957 <br />Gregory.Christian@citynmb.com <br />Project 1: Engineering & PM Services, <br />Public Works (Prime) <br />City of North Miami — Public Works <br />Thomas Positano, CSM <br />Interim Public Works Director <br />(786) 570-2157 <br />tpositano@northmiamifl.gov <br />Project 2: Owner's Engineer Rep. & PM <br />Services (Prime) <br />Town of Bay Harbor Islands — CIP <br />Sam Zamacona, EI <br />Director of Capital Improvement Program <br />(305) 866-6241 Ext. 105 <br />szamacona@bayharborislands-fl.gov <br />Project 3: Continuing Engineering & <br />Capital Program Support (Prime) <br />Signed Reference Questionnaires from these three clients — on the City's form at RFQ page 41 — are provided at Appendix <br />D, satisfying MQR #3 and matching the projects listed for MQR #2 as the RFQ requires. <br />Project Description Forms <br />Eleven project sheets follow. Projects 1, 2, 3, 6, and 11 are the five MQR #2 prime government contracts; the balance <br />demonstrates additional depth in each discipline. Every sheet identifies a client contact and telephone number; all <br />projects listed were performed by TEC's proposed key personnel. <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 46 of 96