Laserfiche WebLink
Page 154CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br /> <br />Michael Melendez, P.E. Page | 2 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Broward County, Highway & Bridge Maintenance Division. Initially a Construction Project Manager, then an Expansion Project <br />Administrator, and then Construction Project Management responsible for supporting the mission of the Division by taking on a <br />variety of assignments ranging from special projects, capital project capital construction management, asset management, <br />emergency recovery operations, FEMA reporting, Surtax planning support, railroad crossings, and GIS applications development, <br />consultant management in addition to his supervisory role. (Broward County Contact: Anh Ton; Telephone: 954-357-6040; Start/End <br />Date: 2017-2022). <br />Andrews Avenue Drawbridge Rehabilitation, Broward County. Construction Project Manager. Responsible for the management <br />of an $8M capital project to rehabilitate the major structural, mechanical, electrical systems of the Andrews Avenue single-leaf <br />bascule bridge over the New River in Downtown Fort Lauderdale. Management included oversight of the contractor’s construction, <br />schedule, budget, and adherence to the contract (BCF-170) while also working with the contractor to resolve requests for information <br />and unforeseen conditions. The project necessitated close coordination with the EOR and architect to ensure the work was <br />consistent with plans or changes were necessary. In addition to the rehabilitation of the major bridge systems, the project included <br />the renovation of the multi-storied control tower to upgrade the bridge control systems, HVAC, backup power systems, fire protection, <br />windows, doors, roof/truss replacement, ADA compliance, and exterior cladding. (Broward County Contact: Anh Ton; Telephone: <br />954-357-6040; Start/End Date: 2019-2021). <br />SR A1A Resurfacing, Restoration, and Rehabilitation, FDOT District 4. Project Manager, Designer, and EOR. The project <br />included the resurfacing of SR A1A from Oakland Park Boulevard to Palm Avenue. The project proposed lane repurposing to <br />accommodate buffered bike lanes, while also ensuring the existing bus stops were preserved and improved. Included production of <br />roadway, signing, and pavement marking plans. Other responsibilities included, but were not limited to team management, client <br />coordination, public involvement, and utility coordination. (FDOT Contact: James Hughes, P.E.; Telephone: 954-777-4419; Start/End <br />Date: 2013-2014). <br />SR 822/Sheridan Street Resurfacing, Restoration, and Rehabilitation, FDOT District 4. Project Manager and EOR (roadway, <br />signing, pavement markings, lighting, and traffic control plan). The 2.5-mile project included resurfacing, signing, pavement <br />markings, lighting, signalization, landscape, and ADA improvements. Other responsibilities included, but were not limited to team <br />management, client coordination, public involvement, utility coordination, and post-design services. (FDOT Contact: Julio Delgado, <br />P.E.; Start/End Date: 2009-2011). <br />SR 5/US-1 (City of Miami) Resurfacing, Restoration, and Rehabilitation, FDOT District 6. Project Manager. Project included <br />resurfacing, signing, pavement markings, drainage, safety, widening, and ADA improvements. Other responsibilities included, but <br />were not limited to team management, client coordination, and public involvement. (FDOT Contact: Fabiana Gonzalez; Start/End <br />Date: 2014-2015). <br />SR 5/US-1 (Palm Beach County) Resurfacing, Restoration, and Rehabilitation, FDOT District 4. In-house Lead Designer. <br />Project included resurfacing, signing, pavement markings, drainage, cross-slope correction, and ADA improvements. Other <br />responsibilities included, but were not limited to team management, client coordination, and public involvement. (FDOT Contact: <br />Scott Peterson; Telephone: 954-777-4416; Start/End Date: 2001-2002). <br />SR 842/Broward Boulevard Resurfacing, Restoration, and Rehabilitation, FDOT District 4. In-house Lead Designer. Project <br />included resurfacing, signing, pavement markings, drainage, seawall, plateaued intersection, transit, and ADA improvements. Other <br />responsibilities included but were not limited to team management and public involvement. (FDOT Contact: Scott Peterson, P.E.; <br />Telephone: 954-777-4416; Start/End Date: 2002-2003). <br />SR 7/US-441 Realignment and Reconstruction, FDOT District 4. In-house Lead Designer. Project included the development of <br />preliminary plans (horizontal and vertical geometry) to realign and reconstruct a portion of SR 7 adjacent to the future Seminole Hard <br />Rock Hotel & Casino. The plans were the basis for identifying right-of-way impacts and a land-swap agreement between FDOT and <br />the Seminole Indian Tribe. (FDOT Contact: Richard Creed, P.E.; Start/End Date: 2001-2001). <br />